Loading…
Loading…
4,588 results • Latest
Construction and Maintenance of Road L061-(Link Road) Dhara to Dhanori Panditpura via Mohina Package No. JK04-4055, PMGSY-IV, Batch-I of 2026-27, Block-Gundana, District Doda (Using Gbion Wall Length-8.280 Kms) Length 8.280 Kms
Construction and Maintenance of Road from L033-(Link Road) AILLI TO Bongli Padhal Package No. JK07-4541, PMGSY-IV, Batch-I of 2026-27, Block-Nagrota Gujroo, District Kathua (Using Open Graded Premix Carpet (OGPC) Length 3.600 Kms) Length 3.600 Kms
Construction and Maintenance of Road from L156-(Link road) KM 6th Budhan Thuroo Back to Kotekatha Package No. JK20-4246, PMGSY-IV, Batch-I of 2026-27, Block-Thuroo, District Reasi. (Using Waste Plastics 12.500 Kms) Length 12.500 Kms
Construction and Maintenance of Road L081-(Link road) Dhalwas Savni road km 3rd to Khandal Package No. JK19-4232, PMGSY-IV, Batch-I of 2026-27, Block-Batote, District Ramban (Using Waste Plastics Length 8.800 Kms) Length 8.800 Kms
Construction and Maintenance of Road from L048-(Link Road) Dhar Road KM 80th to Sourth Package No. JK14-4239, PMGSY-IV, Batch-I of 2026-27, Block-Khoon, District Udhampur. Length 3.375 Kms
Construction and Maintenance of Road L021-(Link Road) Atholi Palali Road KM 16Th to Hakoo Package No. JK17-4209, PMGSY-IV, Batch-I of 2026-27, Block-Paddar, District Kishtwar Length 5.850 Kms
Construction and Maintenance of Road from L109-(Link Road) Kaldi Barmeen road Km 2nd to Gowari Package No. JK14-4040, PMGSY-IV, Batch-I of 2026-27, Block-Ghordi, District Udhampur (Using Waste Plastics 5.268 Kms) Length 5.268 Kms
Construction and Maintenance of Road L034-(Link Road) KM 15th of Chilli Dhandal road to Barchan-Harilag Package No. JK04-4025, PMGSY-IV, Batch-I of 2026-27, Block-Kastigarh, District Doda (Using Gbion Wall Length-0.270 Kms) Length 7.760 Kms
Permanent Restoration of Road from Athwatoo to Labkachal BWO R/B/Walls, Crash Barrier and Pavement Work in patches Package No JK03-292 under SASCI.
Construction and Maintenance of Road L034-(Link Road)LO32 Sanei road km 4.0 to Sanei Upper Package No. JK11-4092, PMGSY-IV, Batch-I of 2026-27, Block-Surankote, District Poonch (Using Waste Plastics Length 3.913) Length 3.913 Kms