Loading
Loading…
Loading…
5,420 results • Latest
As per NIT/BOQ
As per NIT/ BOQ
Maintenance of Flood Damaged road from Tendul Bus Stand to Teandul Barowari Tala Road at Natu GP within Raina-I Block, Total Length of the Road-2.500 Km
Construction of Road from Connection of NHI2 ( Baspur) to Bharat Bangla Kanta via Khirki Koborsthan at Mahadipur GP Under English Bazar Block in the district of Malda under RIDF-XXXI (Length of the road 10.100 Km)
Construction of road from Talit to Simdal Via Baghar within Burdwan-I Block, Length-3.100 Km
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna andother scheme- Post 15 Year