Loading…
Loading…
316 results • Recent activity
a- Drive End Bearing Housing, b- Non Drive End Beaning Housing, c- Bearing Liner, Drive End Trunion, d- Bearing Liner, Non-Drive End Trunion, e- Drive End Vacuum Head LH, with Bridge Plate, f- Rear End Vacuum Head RH, With Bridge Plate, g- Vacuum Head for 10 feet dia x 7 nos. Disc Filter of make- HDO
1- Spares for Rod Mill, Size - 2.7 Mtr. X 4.0 Mtr. Long, Make - MBE, Inner Head Liner Feed Side, 2- Spares for Rod Mill, Size - 2.7 Mtr. X 4.0 Mtr. Long, Make - MBE, Intermediate Head Liner Feed Side, 3- Spares for Rod Mill, Size - 2.7 Mtr. X 4.0 Mtr. Long, Make - MBE, Outer Head Liner Feed Side, 4- Spares for Rod Mill, Size - 2.7 Mtr. X 4.0 Mtr. Long, Make - MBE, Inner Head Liner Discharge Side, 5- Spares for Rod Mill, Size - 2.7 Mtr. X 4.0 Mtr. Long, Make - MBE, Intermediate Head Liner Discharge Side, 6- Spares for Rod Mill, Size - 2.7 Mtr. X 4.0 Mtr. Long, Make - MBE, Outer Head Liner Discharge Side, 7- Spares for Rod Mill, Size - 2.7 Mtr. X 4.0 Mtr. Long, Make - MBE, Fastener with Natural Rubber Sublining for above Feed and Discharge
Custom Bid for Services - Charging of burnt lime into lime conveyor belt of Lime Plant by supplying manpower and Transportation of Burnt Lime from Lime Godown near C R D to Lime Plant including Sunday and holiday Similar Category Cleaning, Sanitation and Disinfection Service - Outcome Based
Wind Solar PV Hybrid System - Off grid (Q2) (3 (3 ))
Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others, Manpower Outsourcing Services - Minimum wage - Semi-skilled; Not Required; Others
Multifunction Machine MFM (V2) (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 10 Number of Auto Extension count 1 Bid Number : GEM/2025/B/7046364 Dated : 26-12-2025 Bid Document 1/8 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No