Loading…
Loading…
1,236 results • Recent activity
Octagonal Pole with Single Arm or Double Arm Brackets (V2) (Q3) (3 (3 ))
Trailer Mounted Suction Machine (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2026/B/7063549 Dated : 02-01-2026 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
LED STRIP LIGHT WHITE COLOUR, LED STRIP LIGHT ORANGE COLOUR, LED STRIP LIGHT GREEN COLOUR, LED STRIP LIGHT CONNECTOR, TAPE ROLL 4 INCH
Octagonal Pole (V2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7096099 Dated : 12-01-2026 Bid Document 1/7 Number of Auto Extension count 1 Past Performance 50 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Octagonal Pole (V2) (Q3), LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3)
XLPE Insulation Power Cable Armored 2 Core 16 sqmm, XLPE Insulation Power Cable Armored 4 Core 16 sqmm, Halogen Lamp 500 Watt, Halogen Lamp 1000 Watt, Halogen Hanger Set 500 Watt, Halogen Hanger Set 1000 Watt, Aluminium Wire 4 mm ISI Marked, Aluminium Wire 10 mm ISI Marked, LED Bulb 25 Watt, LED 25 Watt Bulb Holder, Copper Wire 1 point 5 sqmm, Insulation Tape, Choke 36 Watt Electronic, T 5 Rod 24 Watt, T 5 Choke 48 Watt, LED Driver 90 Watt, LED Driver 50 Watt, LED Driver 25 Watt, LED Plate 25 Watt, LED Plate 50 Watt, LED Plate 90 Watt