Loading…
Loading…
1,277 results • Latest
Customized AMC/CMC for Pre-owned Products - REPAIRING AND MAINTENANCE OVERHEAD SIGN BOARD; NA; Comprehensive Maintenance Contract (CMC); Not Applicable; No
Signage Board (V4) (Q3)
Steel Wheelbarrows (Q3)
Hiring of Consultants - Milestone/Deliverable Based - Preparation of City Development Plan CDP and Detailed Projec; Preparation of City Development Plan CDP and Detailed Projec; No; Hybrid(As specified in scope of work)
Supply, installation, testing, and commissioning of Stainless Steel Water Coolers with inbuilt RO sy
Mobile Containers For Solid Waste Conforming to IS 12402 (Q3) (3 (3 ))
High Strength Structural Fastening And Retention Hardware Package ( 30 kilogram ), Integrated 300 Mm Utility Conduit Connectivity, Sealing, Retention, Load Handling And Fluid Conveyan, Elastomeric Interface Compression Sealing Medium For Mechanical Joint Connectivity, Pressurized Conduit Segment Sealing And Retention Interface Medium
Integrated Water Treatment, Disinfection And Process Control Infrastructure Package, Hydraulic Flow Isolation And Distribution Regulation Infrastructure Package
Octagonal Pole (V2) (Q3), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2)
TITLE 1