Loading…
Loading…
392 results • Recent activity
Hopper Tipper Dumper for Garbage (Q2) (3 (3 ))
Hiring of Agency for IT Projects- Milestone basis
High mast pole for national flags (V2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/7053059 Dated : 29-12-2025 Bid Document 1/7, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders RCM Applicable Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 11 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 50000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be 2/7 in favour of Beneficiary, wherever it is applicable. Beneficiary : Executive Officer NIRMALI, Urban Development & Housing Department Bihar, Urban Development and Housing Department. (Executive Officer)
Bus Stop Shelter (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/7046777 Dated : 26-12-2025 Bid Document 1/8, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders RCM Applicable Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 11 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 50000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be 2/8 in favour of Beneficiary, wherever it is applicable. Beneficiary : Executive Officer NIRMALI, Urban Development & Housing Department Bihar, Urban Development and Housing Department. (Executive Officer)
High mast pole for national flags (V2) (Q3) (3 (3 ))
Camera for CCTV System (V3) (Q2), ANPR Software License, Central ANPR Software Enablement - VMS Integration, NVR 4 Channel, NVR 32 Channel, NVR 64 Channel, ANPR- Enabled NVR 8 Channel, ANPR-Enabled NVR 32 Channel, HDD 1 TB, HDD 4 TB, HDD 8 TB, PoE Gigabit Switch - Pole, Outdoor Lockable Enclosure Cabinet, NVR Rack orTray - Pole Cabinet, CAT-6 or RJ-45 Cable - Pole wiring, RJ-45 Connectors, Micro-SD Card 256 GB, Battery - 50 Ah, Inverter or Hybrid PCU - Pole, Solar Panel or Solar plate, Electrical DB or Board - Pole, Electric Wire 2 sqmm - Power, Steel or GI Pole 5 m, Earthing Protection - Pole, Router or ONT - Per Pole Internet Termination, Static IP and Internet Plan - Service, Optical Fibre Cable - OFC, Media converter, Installation and Commissioning - Electricals incl, Testing, Installation and Commissioning of CCTV - NVR - Complete Setup - System and Go-Live Scope, Central VMS - Monitoring Workstation - PC, Interactive Display - 75 inches, LED Display or Monitor Wall, Core or Distribution Switch, Control Room Rack-6U, Control Room Rack-9U, Online UPS - 6 kVA with External Battery Bank, Control Room Internet, Fire Extinguisher, Air Conditioners, Miscellaneous Installation and Integration Accessories