Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
2,138 results • Latest
Construction of Urban piped water supply schemes with HYTW, electric driven motor pumps, 8m RCC staging, distribution network, FHTCs etc. with O&M for five years including electric charges in Nagar Nigam Madhubani Ward No 07B (Pilakhwar Sekhtoli) .
CONSTRACTION OF RCC DRAIN & PCC ROAD FROM SOHAN JEE JHA HOUSE TO BEHIND OF RAMANAND JHA HOUSE & BADRI HOUSE TO TUNNA THAKUR HOUSE in ward no- 01 AT NAGAR NIGAM MADHUBANI
Supplying, Installation and Commissioning of Street Light work under Nagar Panchayat Saraiya.
Mobile Containers For Solid Waste Conforming to IS 12402 (Q3) (3 (3 ))
data wall display (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover, Additional Doc 1 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2026/B/7085453 Dated : 09-01-2026 Bid Document 1/8, -- Number of days for which Bid would be auto -- extended 10 Number of Auto Extension count 1 Past Performance 60 % Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 3840000 Payment Timelines Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank Bank Of Baroda EMD Amount 50000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. 2/8 (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : TAX DAROGA BIKRAMGANJ koath, Urban Development & Housing Department Bihar, Urban Development and Housing Department, (Birendra Kumar Choudhary)
Unbranded--MALVIYA AGRO WORKS Tanker of Capacity 5000 liter on Balanced Trailer (Double Axle)
Camera for CCTV System (V3) (Q2), Video Recorder for CCTV System (V2) (Q2) (3 (3 ))
SUPPLY OF 01(ONE) NOS WATER TANKER WITH 5000 LTR CAPACITY IN NGAR PANCHAYT BASANTPUR, SIWAN.
SSE SAI SHREE ENTERPRISES Vehicle Mounted Fogging machine, SSE SAI SHREE ENTERPRISES Vehicle Mounted Fogging machine Electrical Starting
Construction of Urban piped water supply schemes with HYTW, electric driven motor pumps, 8m RCC staging, distribution network, FHTCs etc. with O&M for five years including electric charges in Nagar Nigam Madhubani Ward No-01A (Paswan Tola, Jitwarpur) .
Fabricated Special Purpose Vehicle on Truck/Van (Q3) (3 (3 ))
Construction of Urban piped water supply schemes with HYTW, electric driven motor pumps, 8m RCC staging, distribution network, FHTCs etc. with O&M for five years including electric charges in Nagar Nigam Madhubani Ward No 01B (Mahapatra Tola, Jitwarpur) .
Construction of Urban piped water supply schemes with HYTW, electric driven motor pumps, 8m RCC staging, distribution network, FHTCs etc. with O&M for five years including electric charges in Nagar Nigam Madhubani Ward No 11C (Brahm Sthan) .
Construction of Urban piped water supply schemes with HYTW, electric driven motor pumps, 8m RCC staging, distribution network, FHTCs etc. with O&M for five years including electric charges in Nagar Nigam Madhubani Ward No 07A (Adarsh Nagar colony) .
Construction of Urban piped water supply schemes with HYTW, electric driven motor pumps, 8m RCC staging, distribution network, FHTCs etc. with O&M for five years including electric charges in Nagar Nigam Madhubani Ward No 11B (R. K. College) .
Construction, Supply, Testing, commissioning of Urban Piped Water Supply Schemes with extension of pipeline for Leftout wards 6 & 10 Under 'har ghar nal ka jal' with Electric Driven Pumps for Non-Quality Wards of Patna District Block- Danapur of Bihar on turn-key basis with 3 months Trial Run after Commissioning under Mukhmantri Nishchay (Non-Quality Affected) Yojna Under Nagar Parishad Khagaul.
Construction, Supply, Testing, commissioning of Urban Piped Water Supply Schemes with extension of pipeline for Leftout ward-5 Under 'har ghar nal ka jal' with Electric Driven Pumps for Non-Quality Wards of Patna District Block- Danapur of Bihar on turn-key basis with 3 months Trial Run after Commissioning under Mukhmantri Nishchay (Non-Quality Affected) Yojna Under Nagar Parishad Khagaul.
Construction, Supply, Testing, commissioning of Urban Piped Water Supply Schemes with extension of pipeline for Leftout ward-24 Under 'har ghar nal ka jal' with Electric Driven Pumps for Non-Quality Wards of Patna District Block- Danapur of Bihar on turn-key basis with 3 months Trial Run after Commissioning under Mukhmantri Nishchay (Non-Quality Affected) Yojna Under Nagar Parishad Khagaul..
Detail Estimated cost for Construction of PCC Road From Devi Sthan to Sunil Manjhi-Prasad manjhi in Ward No-26, Under Nagar Parishad Bodhgaya, District- Gaya.
Drinking Water Coolers (V4) ISI Marked To IS 1475 (Q2) (3 (3 ))
Signage Board (V4) (Q3)
Construction of RCC drain and PCC road from Gayatri Devi's house to Ashok Mahato's house via Nagendra ji to Mohammad Sabdar's house in ward no. 23 under Danapur Municipal Council Nizamat.
Bus Stop Shelter (Q3)
Fogging Machine (V2) as per IS 14855 (Part 1) (Q2) (3 (3 ))
Construction of RCC drain and PCC road from Chalitra Singh's house to Vijay ji's house in ward no. 23 under Danapur Municipal Council Nizamat.
Construction of RCC drain and chamber from Arun Ram's house to Well and Well to Monu ji's house in ward no. 29 under Danapur Municipal Council Nizamat.
Construction of RCC drain and chamber from Jagdish Prasad's house to Sanjay Vishwakarma's house in ward no. 23 under Danapur Municipal Council Nizamat.
Construction of PCC path and Hume pipe drain from Ganeshji's house to Shiv Madour to Shri Satyanarayanji's house and from Rajanji's house to Rajkishoreji's house via Nagendraji's house in ward no. 23 under Danapur Municipal Council Nizamat.
Construction of R.C.C. drain and chamber from Kuaa to Shivnath Singh's house in ward no. 23 under Nagar Parishad Danapur Nizamat.
Construction of PCC road from Arun Ram's house to Well and Well to Monu ji's house in ward no. 23 under Danapur Municipal Council Nizamat.
Construction of PCC road from Dr. Ramesh Maha Seth's house to Mr. Mohan Sah and Arvind Gupta's house to Vijay and Pappu ji's house to Riku's house in ward no. 23 under Nagar Ghar Parishad Danapur Nizamat.
Construction of PCC path and RC Sati drain and chamber from Shivnath Singh's house to Tinku ji's house and from Viran Mahato's house to Subodh Singh's house and from Chalitar Singh's house to Ajit Kumar's house in ward no. 23 under Danapur Municipal Council Nizamat.
Construction of RCC drain and chamber from Avishek Mahato's house to Vinod Sah's house in ward no. 23 under Danapur Municipal Council Nizamat.
Construction of PCC path and RCC drain and chamber from Ashok ji's house to Green Field Chowk and from Green Field Chowk to Guddu ji's house in ward no. 23 under Danapur Municipal Council Nizamat.
Construction of PCC path and Hyun pipe drain from Kamlesh Kumar's house to Dishu Sharma's house in ward no. 23 under Danapur Municipal Council Nizamat.
Construction of PCC path and RCC drain from Triveni ji's house to Munna Qureshi's house in ward no. 23 under Danapur Municipal Council Nizamat.
GROUP NO.- 17 Name of Work :-BOQ of Four No. of Submersible Pump With water Supply through Stand post in each Ward with in Municipal Corporation area from ward No 25 - 28.
Construction of P.C.C. Road & Drain from Dharmendra ji House to Main Road via Surendra Prasad , Ramsuroop Manjhi Faguni Manjhi in Ward No-28 , Under Nagar Parishad Bodhgaya, District-Gaya.
Potable Water Purification System DE - Ionization Based (Q3) (3 (3 ))
Truck Mounted Boom Lift Platform (Q2)
12 Watt White-LED Based Solar Street Lighting System As
Construction work of 6.2 TPD wet waste processing plant (compost plant) under Nagar Panchayat Hasanpura and operation and maintenance work of the plant for 5 years including the tipping fee.
Construction work of 5.6 TPD dry waste processing plant (MRF+RDF) under Nagar Panchayat Hasanpura and operation and maintenance work of the plant for 5 years on EPC mode.
Construction of Urban piped water supply schemes with HYTW, electric driven motor pumps, 8m RCC staging, distribution network, FHTCs etc. with O&M for five years including electric charges in Nagar Nigam Madhubani Ward No 16E (Hanuman Bagh Colony) .
Construction of Urban piped water supply schemes with HYTW, electric driven motor pumps, 8m RCC staging, distribution network, FHTCs etc. with O&M for five years including electric charges in Nagar Nigam Madhubani Ward No 16C (Das Tola) .
Cattle Catcher Vehicle (V4) (Q2) (3 (3 ))
Truck Mounted Boom Lift Platform (Q2) (3 (3 ))
Signage Board (V4) (Q3)
Construction of PCC Road From Jai Prakash Bhagat House Via Durga Stan to Subodh Bhagat House in Ward No.-17
Bus Stop Shelter (Q3)