Loading…
Loading…
926 results • Latest
Construction of road layers from sub grade to binder or wearing course having width 24.00 mt. and above T. P. road falling in South zone-B (Kanakpur) of Surat city by contractor s own batch mix type hotmix plant and W.M.M. plant within Surat city limit with sensor operator paver finisher including construction or repair of footpath, divider, water table and providing and laying or fixing pavement markings, road stud, road signages with other traffic safety measures. (Work No. 01).
Construction of Road Layers from sub grade to Binder/wearing course and recarpet of internal society road, gamtal road and reinstate of trench line falling in Unn, Jiav, Sonari, Gabheni, Dipli, Budiya, Talangpur, Umber and other areas of South Zone-B (Kanakpur) of Surat city by contractor’s own Batch mix type Hotmix Plant and WMM plant to be installed within Surat city limit with Sensor operator paver finisher including construction/repair of footpath, divider, water table and providing and laying/fixing of pavement markings, road studs, road signages with other traffic safety measures. (Work No.3)
Construction of Road Layers from sub grade to Binder/wearing course having width 24.00 mt. and Below T.P. Road falling in South Zone-B(Kanakpur) of Surat city by Contractor s own Batch mix type Hotmix Plant and WMM plant within Surat city limit with Sensor operator paver finisher including construction/repair of footpath, divider, water table and providing and laying/fixing of pavement markings, road stud, road signages with other traffic safety measures.[Work no-2]
Annual Subscription of Print National and International Medical Journals (Jan-Dec 2026)
Bid Documents for Construction Work Of Paverblock ,C.C Road , Protection Wall and Smashan Work In Various Area At Dakor Nagarpalika, Dakor Under Jilla Aayojan 2026-27 Grant, Dist:- Kheda.
TENDER FOR PROCUREMENT OF M.L.OIL & OTHER INSECTICIDES
Allotment of SMC built & managed PDU Indoor Stadium, located in Athwa-Umra area of Surat City, on rental basis for organizing Navaratri this year, i.e. from 11th October, 2026 to 20th October, 2026 (3rd Attempt)s
Construction of 4 Lane PSS VUDA Green Ring Road (Phase-II) (Pkg-1) in the state of Gujarat.
Construction of C.C. Road, Storm Water Line and miscellaneous works on Trimandir to Shri Dada Bhagwan Hall Road at Adalaj in GUDA Area
OPERATIONS TO PROCESS LEGACY WASTE AT THE VERAVAL-PATAN JOINT MUNICIPALITY’S DUMP SITE USING THE BIO-MINING METHOD