Loading…
Loading…
9,200 results • Latest
LABOUR WORK FOR HAND LAYING PATCHWORK OF HOT MIX MATERIALS AT POCKET-2 ( LEFT SIDE FROM METRO ROAD TO TAKSHSHILA SCHOOL ROAD)AREA & DIFFERENT PLACES IN VASTRAL WARD at EAST ZONE
LABOUR WORK FOR HAND LAYING PATCHWORK OF HOT MIX MATERIALS AT POCKET-3 ( Right Side From Takshshila school Road to Adinath Area) & DIFFERENT PLACES IN VASTRAL WARD at East Zone
LABOUR WORK FOR HAND LAYING PATCHWORK OF HOT MIX MATERIALS AT POCKET-4 ( BEHIND SP RING ROAD ) AREA & DIFFERENT PLACES IN VASTRAL WARD at East Zone
Providing and Laying New Drainage line And upgradation of existing drainage line and machine hole for drainage related problems and other necessary work in pocket-1 in vastral ward.
Annual Rate Contract for Providing and Applying Hot Thermoplastic Road Marking Paint (Assian, Burger & As Per MORTH) with Glass Beads on Various Junction / Inter Section on Bituminous Roads / C.C.Road for Cycle Track at Subzone-2 in South Zone- A (Udhana), Surat.
Annual Rate contract for Maintenance, Repairing and Fabrication work of M.S Railing on Various Location Of NRCP Pala Road of parallel to khadi and BRTS M.S railling on various BRTS roads of Sub Zone-2 in South Zone-A (Udhana).