Loading…
Loading…
8,981 results • Latest
Facility Management Services - LumpSum Based - 01 KW SOLAR PLANT ON 05 DIFFERENT TOILETS; 05 UNITS; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - SKYLIFT ON TATA ACE FABRICATION; QTY 01 PCS; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - 05 KW SOLAR PLANT ON MRF; QTY 01 UNIT; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - PPE KIT FOR SWEEPING WORKERS; QTY 10PCS; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - PPE KIT FOR SAFETY OF SWEEPING WORKERS; QTY 500 UNITS; Consumables to be provided by service provider (inclusive in contract cost)
Hydrated Lime (V3) Conforming To Is 1540 (Part 2) (Q3)
LED Luminaire For Road And Street Lights Conforming To IS
Octagonal Pole (V2) (Q3) (3 (3 ))
Manpower Outsourcing Services - Minimum wage - Skilled; Graduate; Admin, Manpower Outsourcing Services - Minimum wage - Semi-skilled; High School; Others, Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others
XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2) (3 (3 ))
Supply and Installation of 5000 Ltr Capacity Water Cooler
Octagonal Pole (V2) (Q3)
Manpower Outsourcing Services - Minimum wage - Semi- skilled; High School; Others
Tanker on Agricultural Trailer (Q2) (3 (3 ))
Fogging Machine (V2) as per IS 14855 (Part 1) (Q2) (3 (3 ))
Agricultural Trailer Complying to AIS 112 (Q2) (3 (3 ))
Submersible Pumpsets (Three Phase) Conforming To IS
LED Luminaire For Floodlight Conforming To IS 10322 (Part 5/Section 5) (V3) (Under BIS Scheme - II) (Q2) (3 (3 ))
LED Luminaire For Road And Street Lights Conforming To IS
Octagonal Pole with Single Arm or Double Arm Brackets (V2) (Q3), LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) ( ( 3 3 ))
Octagonal Pole (V2) (Q3)
Malathion Dusting Powder(V2) Conforming To IS 2568 (Q2) (3 (3 ))
45 Liter Skid Steer Loader with Multi Purpose Bucket and Operating load 2400 kilogram
Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others, Manpower Outsourcing Services - Minimum wage - Skilled; Secondary School; Others
Steel Wheelbarrows (Q3)
Facility Management Services - LumpSum Based - DAILY USE MATERIAL FOR SBM TOILETS AND OFFICE; ALL ITEMS AND QUANTITY AS PER ATTACHED LIST; Consumables to be provided by service provider (inclusive in contract cost)
OTR Tyres (V2) (Q3)
Tanker on Agricultural Trailer (Q2) (3 (3 ))
Facility Management Services - LumpSum Based - Goverment; Supply of 150 litre deltamythrin 1 25 ULV; Consumables to be provided by service provider (inclusive in contract cost)
Temephos Granules 1% (Q3)
Electrical Cable Lugs (Q3)
Decorative Lightning Pole (V2) (Q3)
Decorative Lightning Pole (V2) (Q3)
Octagonal Pole (V2) (Q3)
Octagonal Pole (V2) (Q3)
Octagonal Pole (V2) (Q3)
Hopper Tipper Dumper for Garbage (Q2) (3 (3 ))
Unbranded Aluminium 0-10V Dimmable Light Emitting Diode, Unbranded Aluminium 0-10V Dimmable Light Emitting Diode Driver, Dimming, percent NA
Unbranded Suit ( Winter ) - IAF Set Size 2
Unbranded 125 Cast Iron detachable joints for use with Asbestos, Unbranded 125 Cast Iron detachable joints for use with Asbestos Cement Pressure Pipes
Unbranded Aluminium 0-10V Dimmable Light Emitting Diode, Unbranded Aluminium 0-10V Dimmable Light Emitting Diode Driver, Dimming, percent NA
Sanitary Napkins Vending Machines (Q3)
LED Luminaire For Road And Street Lights Conforming To IS
Drinking Water Coolers (V4) ISI Marked To IS 1475 (Q2) (3 (3 ))
Octagonal Pole (V2) (Q3)
Waste Container (V3) (Q4)
Submersible Pumpsets (Three Phase) Conforming To IS8034 (V2) (Q2)
Trailer Mounted Suction Machine (Q3)
Hydrated Lime (V3) Conforming To Is 1540 (Part 2) (Q3) (3 (3 ))
Octagonal Pole (V2) (Q3), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) (3 (3 ))