Loading…
Loading…
23,812 results • Latest
Operation and maintenance of Decorative light in various park and green belt at ward No- 8,28,29,30 and 32 under zone-4 under Municipal Corporation Gurugram. (For Two Year)
Construction of PCC Road at Sosti Nagar, Ismile near house of Md. Wakil within Ward No. 83 under Borough No. VI, AMC.
Withdrawing the submersible pump motor set and installation the same after proper repairing of pump motor set and supply one no.PVC column pipe, 6.0sq. mm 3 core flat cable and other allied works etc at NS Dutta road Vijayananda Park Pump House
Estimate for construction of road flank from Salkia School Road to Nandalal Mitra Lane and emergency repairing of road flanks at different places in ward no. 12 under Borough -II, HMC
Withdrawing the 20 HP burnt submersible pump motor set and installation the same after proper re-winding repairing of pump motor set and supply 6.0 sq.mm 3 core flat cable, other allied works at Puillya pump house under word no.46
Construction Of Paver Block Fixing for the up-gradation of ground infront of Rabindrapally Sree Sangha , Ward No 8 Within Burdwan Municipality
Repairing of Black Top Road in Different Area W. no. 21, 22 under Dum Dum Municipality, Rate based on PWD (Rds) NH Wing
Plumbing and Pipeline Work at Kundubagan RadhaKrishna Mondir ward 16,Babiana Angwanwari School ward 03, Ward Office of ward 16.
SEE NIT
Repaaring of Pot Holes at different wards (77, 81, 94 and 95) within Borough - VII under Asansol Municipal Corporation.
Renovation of roads AND drain along with others ancilliary work from 36/2 to 13/3 Ramkrishna mandir Path in Ward no 09. under Borough-II, H.M.C.
Renovation of Concrete Road from Sasti goria Kalali Goli to Police Station within Ward no-92 under AMC
Withdrawing the burnt submersible pump motor set and installation the same after proper re-winding repairing of pump motor set and supply 6.0 sq.mm 3 core flat cable and other allied works at Kaipukur pump house under word no-32
Repairing of Black Top Road in Different Area W. no. 15,16 under Dum Dum Municipality, Rate based on PWD (Rds) NH Wing
Patch repairing work of cement concrete road at 14/21/3, 50, 51, 56, 61 Sanatatan Mistry Lane, 77,77,82/6 Bhairab Dutta Lane, 38/9 38/52 fakir Bagan Lane, 67/1/1 G.T. Raod, and 38 Nandalal Ghosh Road in ward no 15, under Borough-II H.M.C.
Operation and maintenance of Decorative light in various park and green belt at ward No- 23,24,25 and 26 under zone-8 under Municipal Corporation Gurugram. (For Two Year)
Construction of drain and Concrete road at 1. Ahmed Nagar 2. Ronai Bam Para 3. Ronai school Para 4. Ronai Bouri Para within Ward no-35 under Asansol Municipal Corporation.
Withdrawing the Burnt submersible pump motor set and installation the same after proper repairing of pump motor set and supply 6.0sq. mm 3 core flat cable and other allied works etc at Aloka Pump House under word no-36
Supply, delivery, installation of (i) M.S. Self supported chimney of 30 Mtr. height (ii) Cast Iron made wood base system and (iii) 440V, 3Ph AC Control Panel allied electrical works for wooden pyre system at Shibpur Burning Ghat under HMC for impro
Construction of drain and Concrete road at Ranisayer Radha Madav Sarani within Ward no-33 under Asansol Municipal Corporation.
Annual maintenance of Electro mechanical works including other allied works of Deep Tube Wells
Patch repairing work of cement concrete road at 38,22,21 15, 10/1 Shrimani Bagan Lane, 38 Jelia Para lane, 21 Ramlal Mukherjee Lane, 30/1 Pilkhana 2nd Bye lane, 3,8,14 Golam Abbas Lane in ward no 15, under Borough-II H.M.C.
Renovation of Concrete Road from Chinkuthi more to Tilak Library within Ward no-92 under Asansol Municipal Corporation
Repairing of Bituminous Road from Raniganj Baazar Choumatha to Vivekananda Statue via Jhorapata AND Road Opposite of Pratapeshwar Shibtala in Ward No 34 under Burdwan Municipality.
Withdrawing the 20 HP Burnt submersible pump motor and installation the same after proper re-winding repairing of pump motor set and supply 6.0 s.q.mm PVC column pipe, 6.0sq. mm 3
SEE NIT
Construction Of Drain At Ankarbagan Joyguru Bhander To Aluminum Factory In Ward No 25 Within Burdwan Municipality
Withdrawing the 20 HP burnt submersible pump motor set and installation the same after proper re-winding repairing of pump motor set and supply 6.0 sq.mm 3 core flat cable with PVC column Pipe and other allied works at Dhasra Panchanantala Pump
Operation and maintenance of Decorative light in various park and green belt at ward No- 19,20,21 and 22 under zone-7 under Municipal Corporation Gurugram. (For Two Year)
Improvement of Drain at Lower Kumarpur, AS-1 area, Rohinirdihi and Kalyanpur Housing, Ward No. 22, Borough- V, under AMC
Development of Market in Sector 39 near Cyber park in ward 12, Division 3A under MCG. Re-call
Withdrawing the submersible pump motor set due to draw down and installation the same after proper repairing of pump motor set and supply PVC column pipe, 6.0sq. mm 3 core flat cable and other allied works etc at Kona Peyara Bagan Pump House under
Construction of Car Shed 5 No Ichlabad South Block at near Kiron Sangha in Ward No 11 under Burdwan Municipality.
Emergent work for SK Para Pump House with supply 15 HP KSB make submersible pump motor set, 6.0 sq.mm 3 core flat cable, PVC column pipe and other related allied work under ward no - 38 of HMC area
Construction of Improvement of C.C.Road ,Drain , cover slab At ward no. 55,Borough- V under AMC
Installation of 2 Nos. Submersible pump within 80 mm dia and 72 m depth PVC pipe for withdrawn ...at (i) Goyalpara Primary School Goyal Para Bus Stand at Goyal Para in ward No-01 under Bolpur Municipality.
Withdrawing the 20 HP burnt submersible pump motor set and installation the same after proper re-winding repairing of pump motor set and supply 6.0 sq.mm 3 core flat cable, PVC column Pipe and other allied works at Puillya pump house under word no.46
Installation of 1 Nos Submersible pump within 80 mm dia and 72 m depth PVC pipe for withdrawn ...at (i) Fulldanga Nichu para in ward No-02 under Bolpur Municipality.
Laying of 110mm dia HDPE pipeline and Road Restoration at Telipukur , In Ward No. 22
Restoration of Bituminous road at S.F. Road from GT Road Durga mandir to Chakraborty more under Asansol Municipal Corporation.
Painting And Colour Works Of Burdwan Harisava Hindu Girls High School Morn, Subhaspally Phase II , Ward No 02 Under Burdwan Municipality
Construction Drain CC pavement at Chattodighari Natun Pally from Ghatak H/O to H/O of Moumita of ward no - 57, Borough - VII under Asansol Municipal Corporation.
SEE NIT
Proposed Street lighting arrangement at different dark area at Satabdi nagar,nai basti,Azad nagar,sosti nagar and Indraprastha of ward no 83 under Asansol Municipal Corporation.
Pump connection with 150mm dia. D.I pipeline and Road Restoration beside Amarpally Matri Bhandar Shop , In Ward No.- 22.
Repairing AND Improvement of Bituminous Road From G.T Road H.P Gas shop to Md Rafik house in Ward No 26 within Burdwan Municipality
INSTALLATION OF MINI MAST STREET LIGHTS
Supply and Installation of 06 Nos. 10 mtr. Mini mast light at Ward No. 102, Kulti, B- IX, under Asansol Municipal Corporation.
Estimate for provision of new LED lights with poles and one no. high mast light Bandh road Tigaon Constituency
Laying of 110mm dia HDPE pipeline,100 mm DI Pipeline and Road Restoration at Kachuri Shop goli, In Ward No. -07.