Loading…
Loading…
23,814 results • Latest
Estimate for improvement of a damaged old cement concrete road by Cement Concrete work (M-20) at 92 to 79 Tripura Roy Lane and surrounding areas at booth no-138 under HMC ward no-11, (L- 115.00m, Av.W- 3.50m)
Estimate for improvement of a damaged old cement concrete road by Cement Concrete work (M-20) at 40 to 37 Nandi Bagan bye Lane and surrounding areas at booth no-115 under HMC ward no-10, (L- 130.00m, Av.W- 3.10m)
Construction of Paver block road of Dorikalmath More to Ghatakpara more (S. N. Banerjee Road) at Ward No.-22. Lat and long. 22.775807, 88.338626
Construction of Paver Block Road from S. N. Banerjee Road to Du Poisa Ghat at Ward No.-22. Lat and long. 22.778081, 88.336266
Construction of Paver block road of Bishalakshmitala Road from Goalapara more to Buro Shib Mondir at Ward No.-22. Lat and long. 22.777743, 88.344001
Improvement of S.B Road (Bituminous pavement road to Concrete paver block road) from Kalital More to Ghosh Para road at ward no-15.
Improvement of bituminous road to Paver block, Sharma Builders to Loknath Enterprise at Purbasha, Ward No - 01. Lat and long. 22.79895405714176, 88.37956494193953
Improvement of bituminous road to Paver block from Jayesree lodge to Anandamath new bridge at Ward No - 01. Lat and long. 22.801285398079635, 88.3794779397374
SEE NIT
Estimate for Providing and Laying RMC M-40 grade from 3B-30BP TO 3B-22BP and 80mm thick inter locking tile M-40 Grade in 3B-15BP TO 3B 30BP Both side of road in Ward no. -16 (New Ward), Badkhal Constituency, Faridabad. (Recall)
SEE NIT
Estimate for improvement of a damaged old cement concrete road by Cement Concrete Work (Grade M20) to 59, Cowies Ghat Road, and surrounding area at booth no. 263, under HMC Ward no - 36 ( Length - 50 m, Width - 4.50 m)
SEE NIT
REPAIRING OF DRAIN ATCHOTONILPUR PASCHIM PARAFROM SK SUNNAR SHOP TODALIM MALLICKHOUSE(APAS/01/260/234/0004)
SEE NIT
SEE NIT
CONSTRUCTION OF NEW DRAINAT CHOTONILPUR PASCHIM PARAFROM TARAK MOLLA HOUSE TODEBDUTAPARTMENT(APAS/01/260/234/0003)
LAYING OF SEWERLINE STARTING FROM H/O TARKESWAR SINGH TO H/O NAGANDRA SHARMA WARD NO 11
IMPROVEMENT OF ROAD BY CEMENT CONCRETE WORK FROM PREMISES NO. 5/2/3 TO 5/2/12 TO 5/2/85 RASHIK KRISHNA BANERJEE LANE UNDER WARD NO. -4 OF BOROUGH-1, HMC.
Repair/Maintenance and Releveling of various streets in ward no. 2 MC Charkhi Dadri.
REPAIRING OF DRAIN ATCHOTONILPUR PIRTALA ROADFROM SK HASU TEA STALL TO SKMUNNASHOP(APAS/01/260/234/0002)
Patch Repairing work of road by cement concrete at different lane and bye lane of Kal Danga Road, Kalu Para Lane, Bhairab Ghatak Lane,Nabin Ghos Lane and Rasik Krishna Banerjee Lane, Under H.M.C. Ward No. - 04.
REPAIRING OF CHAIN LINK FENCING and WALLS PAINTING AT A- BLOCK PARK at ward no 29.
SEE NIT
PATCH REPARING WORK ( POT HOLES REPAIRING ) BY CEMENT CONC. WORK ALONG WITH ANCILLARY WORK AT DIFFERENT LANES AND BYE LANES IN WARD NO.-3, BR-1, HMC.
CONSTRUCTION OF NEW CCROAD AND ADJACENT DRAIN ATCHOTONILPUR PASCIM PARAFROM SK ANOWER HOUSE TOANJAN BHATTACHARJEEHOUSE APAS/01/260/234/0001 CONSTRUCTION OF NEW CCROAD AND ADJACENT DRAIN ATCHOTONILPUR PASCIM PARAFROM SK ANOWER HOUSE TOANJAN BHATTACHA
NSTALLATION OF TUBE WELL AT NOBODOY PALLY NEAR KALI MANDIR(APAS/01/260/174/0011)
IMPROVEMENT OF ROAD OTHERS ANCILLARY WORK FROM13/2/2 NHUBAN MUKHERJEE LANE TO 18 BHUBAN MUKHERJEE LANE,194/4 G T ROAD TO 22 LAL BIHARI BOSE LANE,106/2 BANERJEE BAGAN LANE TO 113 BANERJEE BAGAN LANE,64/1 SHIB GOPAL BANERJEE LANE TO 62 SHIB GOPAL BANE
APAS/01/108/191/0009
Improvement of water supply by New Laying of 110 mm dia HDPE pipes by providing Valves and allied works with Road restoration from 283/3 to 283/14, Belilious Road Under ward no-20 of HMC .(A.C.-171, P.S. No- 23).
CONSTRUCTION OF NEW TOILET BLOCK AT BANKA MATH(APAS/01/260/174/0001)
RENOVATION PVAER BLOCK AT B-BLOCK GROUND at ward no 29.
Annual operation of pump for the deep tube well at koi pukur under ward no -32 of HMC.
IMPROVEMENT OF ROAD BY CEMENT CONCRETE ( R.M.C ) WITH ANCILLARY WORK FROM I) 6/1 , LAL BIHARY BOSE LANE TO 8/2/3 , LAL BEHARY BOSE LANE, II) 5 CHAKRABORTY BAGAN LANE TO 8 CHAKRABORTY BAGAN LANE , AND ORS PLACES UNDER WARD NO. 3 BR1 HMC (15TH FCAA )
Improvement of road ors ancillary work from 66/2 to 68/2/1 Dharmatala road , Under HMC,ward-03(Booth no-39) APAS/01/170/39/0001
Annual operation of pump for the deep tube well at Dharasha panchaantala pump house under ward no -47 of HMC
SEE NIT
Proposed estimate of two-layer Eucalyptus Ballah Pilling near house of Khokan Sarkar at pond side of sasthitala in ward no-06 under- Gobardanga Municipality.
REPAIRING OF OUT SIDE WALLS and PAINTING D- BLOCK PAVER BLOCK at ward no 29.
Annual Repair and Maintenance of Street light points with labour and Material from Ward 01 to Ward 31 MC Palwal Area.
Annual operation of pump for the deep tube well at Sarat Chatterjee Road Bataitala Bourough-VI, under ward no- 40 of HMC
Improvement of road ors ancillary work from 25 to 2 Bhairab Ghatak Lane Under HMC,ward-04(Booth no-45) APAS/01/170/45/0001 Defect Liability Period-05 years
CONSTRUCTION OF NEW CC ROAD AT KALIBAZAR AMTALA FROM BIMALENDU SAMANTA HOUSE TO SUBIR ROY HOUSE(APAS/01/260/136/0005)
Annual operation of pump for the deep tube well at Onkarmal Jetia Road, under ward no- 38 of HMC
Proving and Installation of street Illumination System in All Ward of MC Sampla.
CONSTRUCTION OF NEW CC ROAD AT KALIBAZAR FROM ARUN SAMANTA HOUSE TO AMARNATH ROY HOUSE(APAS/01/260/136/0004)
INSTALLATION OF TUBE WELL BESIDE SURJA MANDIR(APAS/01/260/174/0006)
Reconstruction of IPB streets with Strom water line from Back of Sita Ram Halwai House in ward no.08 , MC Sampla.
Repair of Surface Drain from Oxebow school towards Sajoy Modak in ward no- 15, under Gobardanga Municipality.
REPAIRING OF DRAIN and INSTALATION OF COVER SLAB NEAR BANGUR SCHOOL at ward no 29.