Loading…
Loading…
25,962 results • Latest
Maintenance Operation and Cleaning of all community centre / Rain Baisera/ Auditorium/ Sumpwell ( Including All Equipments, All Sanitation Material for Cleaning Filling of Water Tank and Cleaning of Septic Tank, Maintaining All Greenery and All M
Revised of Construction and Renovation of existing building to set up UH and WC at Sriniketan More Surul in Ward No. 04 under Bolpur Municipality.
Providing Canal Based Drinking Water Supply Scheme for RR Colony, Village Ramgarh and Badshahpur including Construction of Underground Water Storage Tank, Pump House and SITC (Supply, Installation, Testing, and Commissioning) ward no.18.Div-1B,MCG.
Construction and Renovation of existing building to set up Urban Health and Wellness Centre (UH and WC) at Goalpara in Ward No. 01 under Bolpur Municipality for the F.Y.- 2024-25 under PM-ABHIM Scheme
Relaying of Street with (80mm thick I.P Blocks) And Construction of Drain Type-II From H/O AS Shikhawat to Irrihatioon Nala in Moti Baag Colony Ward No-06 (Mhari Sadak Portal Complaint No. 29329)
Providing and fixing of Hot Dip Galvanized Octagonal Electrical pole from Loard krishna school to Narwana road in Municipal Council Bhuna
CONSTRUCTION OF GALLERY AT S.D.S.A at Bolpur.
Const of IPB street from house of Harish to Kari house Ward 14 Bhuna
Repairing of street lighting system by replacement of damaged loop box, faulty cable, earthing including repairing of pole on the path beside Pinnacle Future Build Pvt. Ltd., Aranyak (West), Bidhannagar, ward no.-27, Under Durgapur Municipal Corporat
Repairing of street lighting system by replacement of damaged loop box, faulty cable, earthing including repairing of pole at Meghmallar Sarani beside Jay Jayanti Sarani Bidhannagar ward no.-27 Under Durgapur Municipal Corporation