NABINAGAR | Aurangabad, Bihar·6d agoPublished 22 Aug 2026 Sam Turbo pump assembly 10MD 100 250 D for NTPC Nabinagar TSPS
NTPCGoodsMiscellaneous Goods
Refer Docs•28 AugLast day KAHALGAON | Bhagalpur, Bihar·6d agoPublished 22 Aug 2026 PROCUREMENT OF KIRLOSKAT ASH WATER PUMPS SPARES ST-II AHD AT NTPCKAHALGAON
NTPCGoodsMiscellaneous Goods
Refer Docs•28 AugLast day RIHAND | Sonbhadra, Uttar Pradesh·6d agoPublished 22 Aug 2026 Procurement of JOHN CRANE SEAL FOR DM PLANT STAGE 1 AT NTPC RIHAND
NTPCGoodsMiscellaneous Goods
Refer Docs•28 AugLast day Telangana STPP | Peddapalli, Telangana·7d agoPublished 21 Aug 2026 Supply,installation and commissioning of FOTE system
NTPCWorksMiscellaneous Works
Refer DocsEMD 50,000•31 Aug3 days left NTPC Sipat | Bilaspur, Chhattisgarh·7d agoPublished 21 Aug 2026Corrigendum 125 Aug → 29 Aug Procurement of Thrustor brake and its Spares for CHP area, NTPC Sipat
NTPCGoodsMiscellaneous Goods
Refer Docs•29 Aug1 day left NTPC Korba Super Thermal Power Station | Korba, Chhattisgarh·7d agoPublished 21 Aug 2026Corrigendum 126 Aug → 31 Aug Procurement of Scrapper Conveyor Spares for St II AHD NTPC KORBA
NTPCGoodsMiscellaneous Goods
Refer Docs•31 Aug3 days left Simhadri Super Thermal Power P.O. SIMHADRI VISAKHA | Visakhapatanam, Andhra Pradesh | Telangana·7d agoPublished 21 Aug 2026 Procurement of Bakerhughes make 30 valve and CRH to Drive Turbine valvespares on Single Tender OEM OES basis for TMD of NTPC Telangana
NTPCGoodsMiscellaneous Goods
Refer Docs•31 Aug3 days left Kudgi STPP | Vijayapura, Karnataka·7d agoPublished 21 Aug 2026 FELUWA make HCSD Pump model TGK 350 250 spares for AHD NTPC KUDGI
NTPCGoodsMiscellaneous Goods
Refer Docs•28 AugLast day NTPC KAHALGAON | Bhagalpur, Bihar·7d agoPublished 21 Aug 2026 PROCUREMENT OF PUMP ASSEMBLY WITH MOTOR OF SLUDGE DISPOSAL PUMP STG IIDM PLANT AT NTPCKAHALGAON
NTPCGoodsMiscellaneous Goods
Refer Docs•28 AugLast day Simhadri Super Thermal Power P.O. SIMHADRI VISAKHA | Visakhapatanam, Andhra Pradesh·7d agoPublished 21 Aug 2026 PROCUREMENT OF L and T MAKE VALVES FOR BOILER STAGE 2 2 660mw NTPC TANDA
NTPCGoodsMiscellaneous Goods
Refer Docs•31 Aug3 days left