Loading…
Loading…
1,898 results • Latest
Register (V2) (Q4)
Register (V2) (Q4)
Single/Double Wooden Bed with/without Storage (V2) (Q2), Chair for General Purpose (Q2), Wooden Shelf/Case Rack/Credenza/Modular Storage (V2) (Q2), Modular Table Meeting Table/Centre Table (V2) (Q2), Sofa (V3) (Q2), Dressing Table (Q3) (3 (3 ))
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Attending leakage of R32 refrigerant gas from the outdoor unit of 02 Ton Voltas Split Air Conditioner by repairing the leakage with suitable standard technique followed ..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Commercial; Electrical System or Installation; SEMI TURNKEY
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - 400 kv substation; Substation; Service Provider
Substation Clamps/Connectors (Q3)
Operation And Maintenance Of Switchyard - As per enquiry
Operation And Maintenance Of Switchyard - as per enquiry
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - For Repairing of 10/16 KVA to 400 KVA Damaged Distribution Transformer at Lalitpur Workshop under EWD, Jhansi; Damaged Distribution Transformer; As Per ATC Document and ..