Loading…
Loading…
229 results • Latest
Astronomical Timerfor Street Light Control (Timer Controls) asper IS9000 (Q3)
Operation And Maintenance Of Substation - WORK OF 02 NO LINE CONTROL AND PROTECTION PANEL REPLACEMENT
Panther conductor procurement
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - substation; Power House Equipment, Switchyard, Substation; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Work for measurement of various 132 and 33 KV Transformers Circuit Breakers closing and opening time and contract resistance at various 132 KV Substations under ETD III ..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Work for Transformer oil sample collection from main tank and OLTC tank and testing at various Transmission Substations under ETD II III IV Prayagraj; Substation, Switch..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Commercial; Electrical System or Installation, Power House Equipment, The work of replacement of damaged CT/PT Combined Unit under ETD, Banda against Tender no EDCBNDA-1..
Custom Bid for Services - For the various works to give electric connection in full deposit scheme at 11 substations under the jurisdiction of Electricity Urban Distribution Circle, Firozabad Similar Category Electric Cabling Service Operation And Maintenance Of Substation Operation and Maintenance Of Electrical Systems/Electrical Installations
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - As per ATC; As per ATC; As per ATC
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - As per ATC; As per ATC; As per ATC