Loading…
Loading…
126 live62 closing this weekmost from UP Power Transmission Corp.Ltd (Operation) and UP Power Transmission Corp.Ltd (Works and Projects))
126 results • Latest
Civil Work for Construction of Store room at 220 KV Sub-station Metro Depot, Greater Noida.
Civil work for Modification of 160 MVA T/F Plinth to 200 MVA T/F Plinth at 220 KV S/S Shamli.
Civil work for Increasing Capacity from (2X40 1X20) MVA to (3X40) MVA at 132 KV S/s Bilari, Moradabad.
replacement of 03 Nos. Control and Relay replacement of 03 Nos Control and Relay Panel
Work of Annual/Routine Testing of various Equipment installed at 400 KV S/S Manth, Mathura
Work of Revetment on Tower No. 22 of 132 KV Kirawali 220-Mathura Line under ETD Mathura
Work of Transportation Installation and Commissioning of Emergency Restoration System ERS Tower of 132 KV Chhata-Mathura -II Line between Tower no 39 and 40 Under ETD, Mathura
Work of Residual Life Assessment RLA of 132/33 KV, 40 MVA Transformers at various Sub-Stations of ETD Hathras and ETD Mathura
Work of Residual Life Assessment RLA of 132/33 KV 40 MVA Transformer-I and II Alstom make at 220 KV S/S Chhata Under ETD Mathura
PreLuminary Survey for designing of proposed 765/400kV GIS substation at 400kV GIS S/S Sector 148 Noida under ETDI Noida
WORK AND MATERIAL FOR ADDING 2 NOS. 33KV SAKET NAGAR AND DASHASHWAMEDH BAY
DESIGN DETAILED ENGINEERING MANUFACTURE SUPPLY OF 220 KV SINGLECORE 2000 SQMM COPPER CONDUCTOR CORRUGATED ALUMINIUM SHEATHED XLPE INSULATED CABLE WITH ACCESSORIES CABLE LAYING ERECTION OF JOINTS TERMINATIONS AND FINAL TESTING COMMISSIONING
DESIGN DETAILED ENG MANUFACTURE SUPPLY OF 220 KV SINGLE CORE 1200 SQMM CU COND CORR AL SHEATHED XLPE INSUL CABLE WITH ACCESS CABLE LAYING ERECTION OF JOINTS TERM AND FINAL TESTING COMM OF 220KV DC SEC 148-SEC-155 UG LINE ON TURNKEY
Work Of Modification/Height Raising of 132 KV Double Circuit Agra (4)-Foundry Nagar Transmission line for Metro Rail at Agra, Under ETD-II, Agra
Earth Filling at 132 KV S/S Hasanganj, Unnao
UNDERGROUND SECTION OF 132 KV SC SECTOR 28 YEIDA 220 to SECTOR 10 YEIDA LINE AND 132KV SC JEWAR 220 to SECTOR 10 YEIDA LINE 03 CABLES ON TURNKEY BASIS
Work Of Diversion of 220 KV DC (JTPS-Kasganj) and (JTPS-Mainpuri) line under ETD Mainpuri
Design, Engineering, Manufacturing, Testing, Supply, Stringing, Installation, Testing and Commissioning etc. for Construction of 132 KV and 220 KV Transmission lines on ACSR Panther/Zebra conductor (approx. 74.11 route Kms) of UPPTCL, on Turnkey basi
Pre-Luminary Survey for Balance work of 4x200 KV Multi Circuit Line from 400 KV Substation Sector-148 to Common Point including Crossing Location on Zebra Conductor and 220 1Cx800 Sq.Mm EHV cable under ETDI Noida
Work of Erection of 01 No. 33 KV Barsana Link Line Bay at 220 KV S/S Chhata under ETD Mathura
Work of Annual/Routine Testing of various Equipments installed at 400 KV GIS S/S Agra South
Work of Re-Construction of 2X5 MVAR Capacitor Bank at 132 KV S/S Sasni under ETD, Hathras
Work of Overhauling and Servicing of OLTC of 400/220 KV ICT at 400 KV Substation Manth Under Electricity 400 KV Substation Division Manth, Mathura
Work of Attending the Gas Leakage of 132 KV Breaker at 220 KV S/S Chhata and 220 KV S/S Gokul under ETD, Mathura
ERECTION OF NEW 132/33KV 40MVA T/F-III ALONG WITH 132KV HV BAY AND 33KV LV BAY AND OTHER ASSOCIATED WORKS
ERECTION AND INSTALLATION OF 63MVA T/F ALONGWITH STRENGTHENING OF 132KV BUS BAR FROM SINGLE MOOSE TO TWIN MOOSE AND TWIN JUMPEIRNG OF ALL 33KV FEEDERS