Loading…
Loading…
329 results • Latest
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Overhauling of Lighting system of 200 MW Unit 10 BTPS Obra; Power House Equipment; Service Provider
Custom Bid for Services - Rotation and Replacement of 200NB and 300 NB CI and MS pipeline of ESP hopper and Bottom Discharge line Vacuum Line Ash Slurry disposal line during overhauling of Unit 4 210 MW BTPS Parichha Similar Category Operation and Maintenance Power House/Power Plant
Work of Pulley shaft Repairing
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Overhauling of DC Battery System of 200 MW Units No 10; Power House Equipment; Service Provider
Rubber Gasket For250 NB Pipe Sleeve Joint Coupling, Heat Resistant Up To 150deg. C (as Per Sample) MO, Rubber Gasket For 300 NB Pipe Sleeve Joint Coupling, Heat Resistant Up To 150deg. C (as Per Sample) . M, CIRCULAR RING TYPE Rubber Gasket For200 NB Pipe Sleeve Joint Coupling, Heat Resistant Up To 300deg. C
Electrical motion transmitter