Loading…
Loading…
2,475 live1,661 closing this weekmost from Urban Development Department Uttar Pradesh and Energy Department Uttar Pradesh
2,475 results • Latest
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Government Office; As per attached scope of work; Service Provider
Spur Gear for primary shaft, Spur gear for pump, Filling Pump, Bellows Part No- 0201, Bearing Ring, Ball Bearing Retainer Ring, Flat Seal Ring, Shaft sealing ring, Internal Circlip, External Circlip, O Ring 260X5, O Ring 217X5, Lock Washer, Bellows Part no TCR 40156110, Plain Bearing Part no TIP 8400074201, Drive Pinion Part no TIP 8400107000, Gear Pinion Part no TIP 8400075000, V-Ring Part no TCR 41432380, Scoop Tube Part no TCR 41325160, Sleeve For Scoop Tube, Roll Pin Part no TIP 6062710900, Spur Gear Part no TIP 8400106900, Fluid Indicator, Fusible Plug, SLOTTED ROUND NUT, Slotted Nut, SOCKET HEAD SCREW, ROLL PIN 10 X90 or ROLL PIN 10 X50, Filter element, Pump Gear
Custom Bid for Services - Work of motor rewinding Similar Category Repair, Maintenance and Installation of Plant Systems/Equipments
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Government Office; As per attached scope of work; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - CONSTRUCTION OF 01 NO 33 KV BAY DHAMPUR TOWN II AT 132 KV DHAMPUR; CONSTRUCTION OF 01 NO 33 KV BAY DHAMPUR TOWN II AT 132 KV DHAMPUR; As per PQR and BOQ
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Commercial; Switchyard; Service Provider
CPU Regeneration HCL Dosing Pump, CPU Regeneration Alkali Dosing Pump
Camera for CCTV System (V3) (Q2), Video Recorder for CCTV System (V2) (Q2), Television (V3) (Q2) (3 (3 ))
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Supply and work for Diversion/Height raising of 132 KV Simbhaoli-Gajraula line under ETD-Amroha; Supply and work for Diversion/Height raising of 132 KV Simbhaoli-Gajraul..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - substation; Substation, Switchyard, Power House Equipment, circuit breaker; Service Provider
Manpower Outsourcing Services - Minimum wage - Skilled; 12th Pass with CCC or O Level Certificate by DOEACC; Admin
Manpower Outsourcing Services - Minimum wage - Unskilled; 8th Pass With Cycling; Admin
Computer Table (V3) (Q2), Revolving Chair (V5) (Q2) (3 (3 ))
Customized AMC/CMC for Pre-owned Products - Overhauling with AMC of Manual Polarimeter of Toshniwal make for the one crushing season with spare parts; Overhauling with AMC of Manual Polarimeter; Annual Maintenance Contract (AMC); Monthly; Yes
Desk and Bench Set for Classroom/Training Area (Q2) (3 (3 ))
Rubber Bush for Pump Make- Sintech Pump Model- SVMF- 600 - 540-92, SN-21466, RPM - 970, DEL - 600 C
Operation And Maintenance Of Substation - Replacement of 01Nos Damaged VCB of 33KV Feeder Anepur at 132KV S/S Auraiya under ETD, Etawah
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Commercial; Substation; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Overhauling of Lighting system of 200 MW Unit 10 BTPS Obra; Electrical System or Installation; Service Provider
Customized AMC/CMC for Pre-owned Products - Apheresis Machine; Trima Accel 8100; Comprehensive Maintenance Contract (CMC); As pe ATC; No
MII L-1, then such MSE/Make in India seller shall also be allowed to participate in the RA process. Customized Inverter Of UPS (C&I) For Turbine (30 KVA) Inverter For Turbine With Transfer Switch ( 1 set ), Dismantling, Installation And Commissioning Of Customized Inverter Of UPS (C&I) For Turbine (30 KVA) ( 1 set )
Online 4-Chanel Silica Analyzer Measuring Range: 1– 5000 ppb, user programmable Accuracy Error: ± 0.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Substation; Service Provider
Nylon/Nylon Fiber Conveyor Belt Width: 1600 mm, Belt Strength- 1000 KN/Mtr., No. of Plies: 04 Ply
Cleaning, Sanitation and Disinfection Service - Outcome Based - Office/Commercial/Institutions/Residential; General Cleaning (Sweeping, Mopping, dusting); Indoor, Sanitation and Disinfection Service - Outcome Based - Office/Commercial/Institutions/Residential; Deep Cleaning; Indoor
Belt Conveyor (BHEL Drg./Spare Code GF 342) Inside Length: 3400 mm; Width: 838± 4 mm; Thickness: 7
Facility Management Service - Outcome Based, Facility Management Services - LumpSum Based - OFFICERS TRAINING CENTRE; Horticulture Services, O&M of Electrical Work, PLUMBING WORK; Cost of consumable to be reimbursed to service provider on actual
Customized AMC/CMC for Pre-owned Products - OT LIGHT & OT TABLE; MINDRAY MODEL HYBASE 6100, HY- LED 8600; Comprehensive Maintenance Contract (CMC); AS PER ATC; No
Hiring Of Agency For ISO Certification Service - ISO 9001 - Quality Management System (QMS), ISO 14001 - Environmental Management System (EMS), ISO 45001 - Occupational Health & Safety Management System (OHAS), ISO 27001 - Information Security Manage..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Substation; Substation; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Replacement of damaged mesh of 60 inch dia vibriscreen with new 60 mesh SS 304 Mesh and fitting it in the frame; Service Provider
Supply of Guage Glan Assembly of Bakaulf Make 20 Ton Boiler
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Commercial; Electrical System or Installation; Buyer
Carriage of PCC/STP pole and line material from ESC, Lakhimpur to work site (Aprox distance 0 to 55 KM), Carriage damage line material/scrap material site to store center Lakhimpur (Aprox distance 0 to 55 KM)., Carriage of other line material such as conductor X-arm, pin insulator, disc insulator, guarding angle etc., Dragging of ST/PCC pole to pit site, digging and erection (as per RESPO norms) of 11 KV 9/11/8.5 mtr long ST/PCC pole with fixing of necessary items, such as V-type X-arm, F-bracket, 11 KV Pin/Disc insulator, guarding angle(1.8 mm65x65x6) with nut & bolts its ramming as per RESSPO Specification., Fixing and errection of double pole on 11 mtr. Long ST pole along with fixing of necessary hardware of double pole alongwith necessery pin insulators and grouting as per RESSPO specification and direction of E/I., Streightning of tilted STP Poles 11 Mtr. Long by digging of Pole opening of binding on insulator refitting of earth and raining and binding of conductor on insulator., Streightning of tilted PCC Poles 8.5 Mtr. Long by digging of Pole opening of binding on insulator refitting of earth and raining and binding of conductor on insulator., Grouting of PCC and ST Pole with civil material (cement: Coarse sand:Stone ballast in 1:2:3 ratio) with grouting of pole upto 0.3 mtr. Above ground level (as per RESPO norms). Only pole shall be supplied by the Department., Regrouting of Damage Stay (for STP Pole), Regrouting of Damage Stay (for PCC Pole), Resagging of loose conductor of 33 KV line including opening of binding & rebinding after sagging of conductor., Resagging of loose conductor on 11 KV line including opening of binding & rebinding after sagging of conductor., Streightning of tilled cross arm of 33 KV line including proper tighting of Clamp and fitting of Pin insulators., Streightning of tilled cross arm of 11 KV line including proper tighting of Clamp and fitting of Pin insulators., Cutting of tree branches near 33 KV line to avoid tripping., Cutting of tree branches near 11 KV line to avoid tripping., Repair/Replacement of burned jumper on sectional poles., Repair of Damaged guarding of 33 KV line., Repair of Damaged guarding of 11 KV line.
Hopper Tipper Dumper for Garbage (Q2) (3 (3 ))
Carriage of PCC/STP pole and line material from ESC, Lakhimpur to work site (Aprox distance 0 to 55 KM), Carriage damage line material/scrap material site to store center Lakhimpur (Aprox distance 0 to 55 KM)., Carriage of other line material such as conductor X-arm, pin insulator, disc insulator, guarding angle etc., Dragging of ST/PCC pole to pit site, digging and erection (as per RESPO norms) of 11 KV 9/11/8.5 mtr long ST/PCC pole with fixing of necessary items, such as V-type X-arm, F-bracket, 11 KV Pin/Disc insulator, guarding angle(1.8 mm65x65x6) with nut & bolts its ramming as per RESSPO Specification., Fixing and errection of double pole on 11 mtr. Long ST pole along with fixing of necessary hardware of double pole alongwith necessery pin insulators and grouting as per RESSPO specification and direction of E/I., Streightning of tilted STP Poles 11 Mtr. Long by digging of Pole opening of binding on insulator refitting of earth and raining and binding of conductor on insulator., Streightning of tilted PCC Poles 8.5 Mtr. Long by digging of Pole opening of binding on insulator refitting of earth and raining and binding of conductor on insulator., Grouting of PCC and ST Pole with civil material (cement: Coarse sand:Stone ballast in 1:2:3 ratio) with grouting of pole upto 0.3 mtr. Above ground level (as per RESPO norms). Only pole shall be supplied by the Department., Regrouting of Damage Stay (for STP Pole), Regrouting of Damage Stay (for PCC Pole), Resagging of loose conductor of 33 KV line including opening of binding & rebinding after sagging of conductor., Resagging of loose conductor on 11 KV line including opening of binding & rebinding after sagging of conductor., Streightning of tilled cross arm of 33 KV line including proper tighting of Clamp and fitting of Pin insulators., Streightning of tilled cross arm of 11 KV line including proper tighting of Clamp and fitting of Pin insulators., Cutting of tree branches near 33 KV line to avoid tripping., Cutting of tree branches near 11 KV line to avoid tripping., Repair/Replacement of burned jumper on sectional poles., Repair of Damaged guarding of 33 KV line., Repair of Damaged guarding of 11 KV line.
Carriage of PCC/STP pole and line material from ESC, Lakhimpur to work site (Aprox distance 0 to 55 KM), Carriage damage line material/scrap material site to store center Lakhimpur (Aprox distance 0 to 55 KM)., Carriage of other line material such as conductor X-arm, pin insulator, disc insulator, guarding angle etc., Dragging of ST/PCC pole to pit site, digging and erection (as per RESPO norms) of 11 KV 9/11/8.5 mtr long ST/PCC pole with fixing of necessary items, such as V-type X-arm, F-bracket, 11 KV Pin/Disc insulator, guarding angle(1.8 mm65x65x6) with nut & bolts its ramming as per RESSPO Specification., Fixing and errection of double pole on 11 mtr. Long ST pole along with fixing of necessary hardware of double pole alongwith necessery pin insulators and grouting as per RESSPO specification and direction of E/I., Streightning of tilted STP Poles 11 Mtr. Long by digging of Pole opening of binding on insulator refitting of earth and raining and binding of conductor on insulator., Streightning of tilted PCC Poles 8.5 Mtr. Long by digging of Pole opening of binding on insulator refitting of earth and raining and binding of conductor on insulator., Grouting of PCC and ST Pole with civil material (cement: Coarse sand:Stone ballast in 1:2:3 ratio) with grouting of pole upto 0.3 mtr. Above ground level (as per RESPO norms). Only pole shall be supplied by the Department., Regrouting of Damage Stay (for STP Pole), Regrouting of Damage Stay (for PCC Pole), Resagging of loose conductor of 33 KV line including opening of binding & rebinding after sagging of conductor., Resagging of loose conductor on 11 KV line including opening of binding & rebinding after sagging of conductor., Streightning of tilled cross arm of 33 KV line including proper tighting of Clamp and fitting of Pin insulators., Streightning of tilled cross arm of 11 KV line including proper tighting of Clamp and fitting of Pin insulators., Cutting of tree branches near 33 KV line to avoid tripping., Cutting of tree branches near 11 KV line to avoid tripping., Repair/Replacement of burned jumper on sectional poles., Repair of Damaged guarding of 33 KV line., Repair of Damaged guarding of 11 KV line.
Handling, Transport and Other Mining Services - Percentage quote based - for Gilaula-1 PEG