Loading…
Loading…
2,104 results • Recent activity
Providing bypass connection to pumping main line and outlet pipe at Andhra Prabha Colony ELSR in 58th Division of AE-7 Section
Providing speed breakers in various locations in Mutyalampadu, 31st Division Works Division-II Area
Construction of toilets, CC Pathways, Chequrred terrazzo tiles flooring and paintings to Nandamuri Nagar ELSR Compound in 58th Division
Replacement of Blocked UGD line in Siva Rao Street from 23-23-59 to 23-23-61 in Satyanarayanapuram 33rd Division in Works Division-II
Repairs and raising of low-lying manholes at Ajith Singh Nagar, Thota vari street and nandamuri Nagar areas in 58th Division
Replacement of existing AC Water Supply pipe line with HDPE Water Supply pipe line from 3ATMs Centre to Zam-Zam tea stall at Pipula Road in Santhi Nagar 61st Division Works Division-II Area