Loading…
Loading…
78 results • Recent activity
Operation Maintenance of Arsenic Cum Iron Removal Plant at Mollahati (110.00 cum/hr) Palla Zone -I (175.00 cum/hr) OHR site at Bongaon Block under North 24 Pgs. Water Supply Division-I, PHE Dte. for 365 days.
Operation Maintenance of Arsenic cum Iron Removal Plant at Dighari (110 cum/hr) Khamarkhalla Z-I (182.62 cum/hr) OHR site at Bongaon Block under North 24 Pgs. Water Supply Division-I, PHE Dte. for 365 days.
Operation Maintenance of Arsenic cum Iron Removal Plant at Auldanga Zone-I (Capacity 147.88 cum/hour) Ichhlampur Zone-II (Capacity 66.75 cum/hour) OHR site at Bongaon Block under North 24 Pgs. Water Supply Division-I, PHE Dte. for 365 days.
Operation Maintenance of Arsenic cum Iron Removal Plant at Santoshpur Zone-I (92.00 cum/hr) Santoshpur Zone-II (82.00 cum/hr) OHR site at Bongaon Block under North 24 Pgs. Water Supply Division-I, PHE Dte. for 365 days.
Day to day Operation maintenance of distribution system rising main (CI/DI/AC/UPVC pipe) of Boyra Chandpur ground water Based W/S Scheme under Bagdah Block within the jurisdiction of North 24 Pgs W/S Division I, P.H.E. Dte. for 365 days.
Day to day Operation maintenance of distribution system rising main (CI/DI/AC/UPVC pipe) of Auldanga Zone-I ground water Based W/S Scheme under Bagdah Block within the jurisdiction of North 24 Pgs W/S Division I, P.H.E. Dte.for 365 days.