Loading…
Loading…
855 results • Latest
Carrying out survey and investigation and preparing Design Estimate and Detailed Project Report (DPR) for diversion of Krishna River water to drought prone areas
Carrying out borehole drilling (boreholes) from Km 1 to Km 29 (total length 29 km) for conducting surveys and investigations for preparing the Design Estimates and Detailed Project Report DPR for the project to supply Krishna River water to drough
Carrying out borehole drilling (boreholes) from Km 29 to Km 58 (total length 29 km) for conducting surveys and investigations for preparing the Design Estimates and Detailed Project Report (DPR) for the project to supply Krishna River water to drough
Repair of anicut near Primary School Gram Kachotiya GP Kachotiya Block Suhagpura District Pratapgarh
Repair and renovation of anicut near Hansar ji ke khet pr vill Dewaldi Gram Panchayat Noganwa PS Arnod District Pratapgarh
Construction of Takravat anicut Near Takravat Gram Takrawad GP Barotha PS Pratapgarh District Prataparh
Radial Drilling Machine (Q3)
A4 and Legal Size Multifunction Printer (MFP) (Q2)