Loading…
Loading…
132 results • Latest
RENOVATION OF HEAD WORK AND C.C. LINING OF RIGHT BANK MAIN CANAL RD 0 TO 1140 M AND LEFT BANK MAIN CANAL RD 0 TO 1260 M WITH CONSTRUCTION OF 06 NOS. VRB, 01 NO. FALL, 03 NOS. DRAIANGE CROSSING, 20 NOS. DIRECT OUTLET OF BARDIH TANK OF DHARSIWA BLOCK OF RAIPUR DISTRICT.
Renovation of Earthwork and Repair of 2 Nos. Sluice of Head work and Remodelling and Cement Concrete lining of Left Bank Canal from RD 0 m. to 3150 m, Right Bank Canal from RD 0 m to 2760 m with Construction of 14 Nos. Fall, 5 Nos. Fall cum VRB, 01 No. VRB, Repair of existing structures and fixing of Colaba Pipe of Rochan Tank Scheme in Block- Kawardha of District-Kabirdham (C.G.)
CONSTRUCTION OF ANICUT IN VILLAGE AMALDIH ACROSS KATNGI NALLA OF BLOCK SARAIPALI , DISTRICT MAHASAMUND.
CONSTRUCTION OF DIVERSION WEIR CUM CAUSEWAY, E/W LBC MAIN CANAL RD 0.00 M TO 1740 M , 2 NOS HEAD SLUICE, 2 NOS VRB, 2 NOS CD AND E/W RBC MAIN CANAL RD 0.00 M TO 4980 M , 5 NOS VRB, 6 NOS CD 1 NO VERTICAL FALL AND FIXING 20 NOS OUTLETS OF BANSHDHARI NALA DIVERSION SCHEME
Remodelling & C.C. Lining of Matiya moti main canal R.D. 0 m to R.D. 18600 m, Gidhwa Distributory R.D. 0 m to 2445 m, Bhatagaon Distributory R.D. 0 m to R.D. 3300 m & Sambalpur Minor R.D. 0 m to R.D. 1020 m and Construction of 16 No. Collaba, 04 No. Inlet, 03 No. Pipe V.R.B., 05 No. box V.R.B. & repair work of existing structure of Matiya Moti tank in Block Dondilohara District Balod
RENOVATION OF JAILPARA ANICUT ON KELO RIVER
RENOVATION AND REPAIR OF HEAD WORK, EASTE WEIR & LHS SLUICE, CONSTRUCTION OF R.H.S. SLUIECE, CC LINING WORK OF R.B.C. MAIN CANAL RD 0 M. TO 1350 M., C.C. LINING WORK & LBC MAIN CANAL RD 0 M. TO 990 M., CONSTRUCTION OF 02 NOS, VRB AND 08 NOS OF OUTLETS OF DUGLI TANK SCHEME, BLOCK-NAGRI, DISTRICT – DHAMTARI.
RENOVATION OF HEAD WORK AND C.C. LINING OF BITKULI AND BHATBHERA MINOR WITH CONSTRUCTION OF 12 NOS. Fall, COLABA FIXING OF KUMHARI MEDIUM TANK OF BALODABAZAR BLOCK OF BALODABAZAR-BHATAPARA DISTRICT.
RENOVATION OF REPAIR OF HEAD WORK, HEAD SLUICE, CONSTRUCTION OF RCC BARREL IN MAIN CANAL RD 0 M. TO 570 M. C.C. LINING OF MAIN CANAL FROM RD 570 M. TO 5500 M., REPAIR OF CANAL STRUCTURES, CONSTRUCTION 01 NO. V.R.B. AND 12 NOS. OF CANAL OUTLET OF GADAGHAT DIVERSION SCHEME, BLOCK – NAGRI DISTRICT – DHAMTARI..
REVONATION OF SARNA TANK SCHEME