Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
11,118 results • Latest
ADOR 3000 (Rpm) Motor Driven Welding Generator
Dewatering work of Foundation Gallery PH 1 For Year 2026-27
Unbranded Salon Chair with Adjustable (Through Heavy-duty hydraulic pump) chair height
Unbranded Stainless Steel Chrome Plated Extension Bar, Warranty NA
Supplying Security Guard AT Ekrukhi M.P.Tal Akklkot Dist Solapur
Supplying Security Guard AT Borii M.P.Tal Akklkot Dist Solapur
Preparation OF PDN SURVEY, ESTIMATES AND DETAILED PROJECT REPORT OF 5000Ha. AREA OF M.I. TANKS UNDER SOLAPUR IRRIGATION DIVISION SOLAPUR
DETAIL SURVEY FOR CANAL AND ALIED STRUCTURES AND PRPARATION OF ESTIMATE TALUKA SOUTH SOLAPUR DIST.SOLAPUR
Supply of MS straight New K.T.Weir Needles Kave to Shirapur 12 KT Weirs And 2Bend Nala Total 14 KT Weirs
Supply and installation of Porcupines for additional high priority works in Lakhimpur (Dhakuwakhana, Bonpuroi), Biswanath and Sonitpur Districts Package No. G-24, LOT 2
Construction of Series of Check Dam across Agagdaha Nala at Vil - Basodih under Block - Gandey, District - Giridih
Construction of Check Dam across Gangodarha Nala under Block - Gandey, District - Giridih
Maintenance of work of Bhimsagar dam Chowkidari for the year 2026-27.
Oiline grcasing and rnaintenance of bhimsagar dams and gates during 2026-27
Construction of Check Dam across Bhalpahari Nala under Block - Gandey, District - Giridih
Work of daily gauging of Bhimsagar dam including watch and ward2026-27.
KINGS Wooden Podium design Gable end and modesty panel and top material Three layer prelaminated particle board(Wood Product) of grade II type II of IS 12823/Latest
Construction of Check Dam across Jorua Nala under Block - Gandey, District - Giridih
Gauging and watch and ward of Borda, Sarankheri, Mundliyakheri, Mathniya. Rajpura, Gordhanpura, Kanwarpura, l(adeela, Ganeshpura and Sarola IVIP for year 2026-27
Construction of Check Dam across Nauki Salaiya at Vill - Nauki Salaiya under Block - Gandey, District - Giridih
Construction of Check Dam across Sugijor Nala under Block - Gandey, District - Giridih
Contruction of Panch Mukhi Mahadev Anicut Palesar G.P. Lambahaldu P.S Kotra District Udaipur
Opening and closing of stop dam Gate Shutter under Water Resources Sub Division khilchipur
Supplying of earth filled empty bags and watch and Ward of Ummed Sagar Dam for Mansoon year 2026-27
Watch and Word at Kagdi Pick Up Weir Rest House, Right Flank and Left Flank and Garden For Year 2026-27
Operation and Maintenance of Gates and machinery at Mahi Dam for year 2026-27
Essential Works at Kagdi Pickup weir during flood season for the year 2026-27
KB Silver--KOPYBRIGHT INDIA PRIVATE LIMITED 2.37 kilogram Ream of 500 Sheet 75 gsm A4 size Plain Copier Paper
Repair and Maintenance of Gates and Machinery at Kagdi for Monsoon 2026
ELECTROSTAR 4 Core XLPE Cable, Conductor Area - 25 sq mm
Providing and fixing of Rod, Premansoon repair and maintenance of 8nos. sluice gates of 4 minor irrigation tanks under subdivision Betul District Betul.
Construction of Balance work of Head and Canal of Utarda Tank scheme.
Construction of Balance work of Masuriya Tank scheme.
Construction of Balance Work of Kholar Nalla Stop Dam No-2.
RENOVATION WORK OF HEAD WORK AND CANAL OF BOKARDA TANK SCHEME
Supplying and Laying work of standby cable for main electric power supply from 500 kva , 33/.4 kv sub station to DG room main panel
Unbranded 192 pages Minute register of Colour White
Repairs and Maintenance of Radial gate at Upper Manar Project at Upper Manar Dam tal. Loha , Dist. Nanded
Doble--RAMSONS PVC Insulated Cables, Unsheathed with Rigid Conductor Plain Copper 6 Sq.mm
Repair and Maintenance of Gates, machinery and fabrication of Footbridges at Canals for year 2026-27
Repair maintenance work of mechanical units and electrical repair and maintenance of radial gate control panels, rest house, power house and illumination arrangement at crest of Barna Dam and Saddle Dam Bari for the year 2026-27(Second Call)
Servicing and Maintenance work of equiliser assembly of Radial Crest Gates of Tawa Dam Under Pre-mansoon Maintenance.
Renovation of Mechanical Workshop and Office Building of Mahi Project Banswara
Premansoon Maintenance work Oiling greasing compounding and minor repair work of Tawa RBC of intake well, Dokrikheda Amadehi, Guddikheda, Hinotiya minortank gates for year 2026-27.
ECO RISE 2.34 kilogram Ream of 500 Sheet 75 gsm A4 size Plain Copier Paper
Unbranded Single Use Dry Nonwoven Wipes Pack of 20 pieces
Unbranded Biscuits Cookies Multi-grain 100 gms
Bru Coffee (कॉफ ) Coffee Powder Roasted 100 gms, Bru Coffee (कॉफी) Coffee Powder Roasted 100 gms