Loading…
Loading…
1,509 results • Recent activity
Re-drilling of Kajla DTW (317/M) with Pump house and pipe line work, Electrical wiring and procurement of materials etc. in Lalgola Block under Lalgola (A-I) Sub-Division in the jurisdiction of Berhampore-II (A-I) Division under Core-Sector programme
NIT No 12/2025-26/CORE/STW(S)/JAL(AI) DIV/1 Drilling and Installation of 100 mm dia Shallow Tubewell Solar including Solar PV System for 5 Nos structure STW SOLAR at BARAKAMAT in Mouja BARAKAMAT GP MADHABDANGA II Plot No 5583 5501
NIT No 11/2025-26/CORE/STW(S)/JAL(AI) DIV/3 Drilling and Installation of 100 mm dia Shallow Tubewell Solar including Solar PV System for 3 Nos structure STW SOLAR at KALKUT in Mouja KALKUT GP RAJABHATKHAWA Plot No 263 309 177 in KA
NIT No 11/2025-26/CORE/STW(S)/JAL(AI) DIV/2 Drilling and Installation of 100 mm dia Shallow Tubewell Solar including Solar PV System for 4 Nos structure STW SOLAR at GADADHAR in Mouja GADADHAR GP RAJABHATKHAWA Plot No 264 450 550
Re-excavation of Kotaldi Bara Bundh, at Mouza- Kotaldi, JL No.- 41, Plot No.- 154, 155, Lat 23.594213, Long 86.799111, Block-Santuri, Dist.-Purulia under Purulia (A-I) Division under SSM (CS 2025-26)
NIT No 11/2025-26/CORE/STW(S)/JAL(AI) DIV/1 Drilling and Installation of 100 mm dia Shallow Tubewell Solar including Solar PV System for 6 Nos structure STW SOLAR at PASCHIM CHEPANI in Mouja PASCHIM CHEPANI GP MAHAKALGURI Plot No 2024 1309 199