Loading…
Loading…
1,497 results • Recent activity
Construction of Chalambung Busty M.I. Scheme Chalambung Busty, Sittong -I, Kurseong Block.
Drilling and Installation of LDTW Solar Scheme 4 nos at Mouza Lahuchar JL No 193 Plot Nos 1192 1151 1233 and 1132 Block Harirampur under Gangarampur AI Sub Division of Balurghat AI Division within the jurisdiction of Raiganj AI Circle
Drilling and Installation of LDTW Solar Scheme 05 nos at Mouza Baikunthapur JL No 13 Plot Nos 535/319 549/167 605/101 859/719 and 931/691 Block Gangarampur under Gangarampur AI Sub Division of Balurghat AI Division
Repairing and Renovation of pump house and pipe line at Majhian HDTW scheme under Balurghat AI Sub Division of Balurghat AI Division Balurghat Dakshin Dinajpur
Installation of Kaya Solar Submersible Cluster of Light Duty Tube Well (5) (Depth- 150m) with PVC Pipe at Mouza-Kaya, Block-Panskura in the District of Purba Medinipur under the Executive Engineer (AI), Tamluk (AI) Division under Core-Sector.
Installation of Panskura Uttar Solar Submersible Cluster of LDTW (4 Nos.) Depth 150metre with PVC Pipe at Mouza-Bipulhanda, Paltabera, Paschim Arjunda, in Panskura Block of Purba Midnapore District under the Executive Engineer (AI), Tamluk (AI) Div.