Loading…
Loading…
219 results • Recent activity
Construction of New OHSR 50 cum 2No. Repair of Old OHSR 68 75 and 100 Cum Construction of New Pump Chamber 6.10m x 4.88m Distribution system Providing and fixing of New Household connection
INSTALLING NEW TUBEWELL SIZE OF 200 MM ID STRAIGHT TUBEWELL DRILLING OF 500 MM 20 OF SUITABLE SIZE UPTO 230 MTR. DEPTH IN PLACE OF FAILED TUBEWELL PUMPING MACHINERY RISING MAIN AND ALL CONTINGENT WORKS THEREFORE COMPLETE IN ALL RESPECT
LAYING DI K9 PIPELINE FOR BYPASS SYSTEM OF SIZE 16 inch AND 24 inch 400 MM and 600MM AND SPECIALS INCLUDING SLUICE VALVE CID JOINT AND SLUICE VALVE HAUDI ETC AT PHASE 10 SAS NAGAR AND ALL OTHER WORKS CONTINGENT THERETO
PROVIDING AND LAYING RCC 450 MM I/D AND 600 MM I/D STORM WATER LINE TO PROVIDE RELIEF TO WATER LOGGING PRONE AREA FROM HOUSE NO 1729 to 1724 and 1735 to 1730, PHASE 10, S.A.S. NAGAR AND ALL OTHER WORKS CONTINGENT THERETO.
PROVIDING AND LAYING OF SN-8 UPVC PIPES OF 200 MM O/D DUE TO DAMAGED EXISTING SEWER LINE, CONSTRUCTION OF MANHOLES, CONSTRUCTION OF ROAD GULLIES FROM HOUSE NO 353 TO 363, PHASE 6, S.A.S. NAGAR AND ALL OTHER WORKS CONTIGENT THERETO.
IMPROVEMENT OF WATER SUPPLY SCHEME KOT BAKHTU BLOCK TALWANDI SABO DISTRICT BATHINDA UNDER PLAN SCHEME PM-10 STATE LEVEL INITIATIVE PUNJAB NIRMAN PROGRAMME