Loading…
Loading…
2,614 results • Recent activity
UFLIFTMENT OF THE UNDER-BED DRAINAGE ARRANGEMENT WITH 1ST AND 2ND CUT SAND SCRAPPING, DISINFECTION ACTIVITIES AND REPLACEMENT OF VALVES OF THE SSFB UNIT NO-E-14 UNDER EXTENSION SERIES AT IGWTP
MAINTENANCE OF THE DYKE END STRETCH BY REMOVAL OF ROTTEN HYACINTHS ETC AT IGWTP
MAINTENANCE OF THE AREAS ALONG THE END STRETCH EMBANKMENT AND ROADWAYS OF THE FINAL SETTLING TANK BY CLEANING OF JUNGLES/BUSHES AND ACCUMULATED ROTTEN HYACINTHS ETC AT IGWTP.
UPLIFTMENT OF THE FINAL SETTLING TANK AREA IN BETWEEN THE SECURITY WATCH TOWER NO-19 TO 13A ALONG SANTASHREEPALLY LOCALITY BY CLEANING AND REMOVAL OF FLOATING WEEDS, HYACINTHS ETC AT IGWTP
SUPPLY INSTALLATION AND COMMISSIONING OF COAGULANT LIFTING PUMPS AND ITS PIPING NETWORK COMPONENTS AT MODULE 1,2 and 5 (3X20 MGD) PULSATOR TYPE WTP, UNDER IGWTP
RESTORATION OF CORRODED 150 MM DIA MILD STEEL SHORT PIECE AT THE BOTTOM OF 72 INCH DIA T.P. MAIN AIR VALVE NEAR PANIHATI TELEPHONE EXCHANGE AND MULLARHUT AND TEXMACO PANIHATI EASTERN FLANK OF B.T. ROAD