Loading…
Loading…
4,567 results • Latest
Repair and Renovation of the structural portions of the rooms allotted to the Assistant Engineers (AEs) and Junior Engineers (JEs) of WBSRDA Howrah Division-II Office
UT134782 L029 Bonga to Kyan Idalgaon MR Stage I and II
UT134787 L021 NH34 to Aungee MR Stage-I and II
Construction and Maintenance of Road from L089-(Link road) Km 3rd Rd 200 PWD Kakara road to Khet Khappar Naka, Package No. JK12-4529, PMGSY-IV, Batch-I of 2025-26, Block-Budhal, District Rajouri. (Using Waste Plastic) Length-11.000 Kms
Construction and Maintenance of Road L026-KM 5TH OF PHAMANAR PARAT ROAD TO KARNAH PRAT Package No. JK11-4512, PMGSY-IV, Batch-I of 2026-27, Block-Mendhar, District Poonch (Using Waste Plastics Length 3.000) Length 3.000 Kms
Construction and Maintenance of Road from L028-Link Road Parain to Kotli Package No. JK12-4079, PMGSY-IV, Batch-I of 2026-27, Block-Qila Darhal, District Rajouri Length 4.136 Kms
Construction and Maintenance of Road from L034-(Link Road) padha to seri Package No. JK12-4078, PMGSY-IV, Batch-I of 2026-27, Block-Qila Darhal, District Rajouri (Using Waste Plastics Length 12.000 Kms) Length 12.000 Kms
Construction and Maintenance of Road L043-LASSANA BACHAIWALI KM 4 TO HILL WALI HILLGARANG HILL JABRA Package No. JK11-4032, PMGSY-IV, Batch-I of 2026-27, Block-Lassana, District Poonch (Using Waste Plastics Length 3.500 Kms) Length 3.500 Kms
2nd call Restoration work at Dewal Kheta KM 10 to Mopata MR
Construction and Maintenance of Road from L030-(Link Road) Mantalai to Sira km 10th to seri Package No. JK14-4007, PMGSY-IV, Batch-I of 2026-27, Block- Chenani, District Udhampur. (Using Waste Plastics 7.850 Kms) Length 7.850 Kms