Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
18 results • Latest
Deployment of Support Staff, Data Entry Operator and Security Personnel
Notice Inviting Quotation For Supply and Installation Of IT peripherals at WBHDCL Office Building
supply of Chairs for Conference Room at WBHDCL Office Building
Setting up of Conference Room with Conference table and other ancillary works required at WBHDCL Office
Preparation of Detailed Project Report (DPR) for Diversion of State Highway No. 9 (Bankura-Durgapur Road) From KM 35.740 To KM 38.540 stretching about 2.8 km within the Mine Boundary of Trans Damodar Coal Mine vested to the Durgapur Projects Ltd.
Conducting Traffic census on Barrackpore- Kalyani Expressway, in the District Of North 24 Parganas and Nadia, West Bengal at three locations
Consultancy Services for preparation of DPR for Widening and Strengthening to Standard 4 Lane of Existing 2 Lane Road from Panagarh - Ilambazar- Dubrajpur Road (Km 0.00 to Km 49.00) including Bridges in the District of Burdwan and Birbhum, WB
Consultancy Services for preparation of DPR for Widening and Strengthening to Standard 4 Lane of Existing 2 Lane Road of SH-9 from Durgapur(at Muchipara NH-2 Junction) to Bankura (Heavy More, NH 60 junction) including Bridges and ROB...
Consultancy services for Authority Engineer for Upgradation of Kalyani Expressway to 4/6 lane configuration from Muragacha to Kampa including elevated connection with proposed Mogra Kampa Barajaguli road corridor in W.B.(PH II)
UPGRADATION OF KALYANI EXPRESSWAY TO 4/6 LANE CONFIGURATION FROM MURAGACHA TO KAMPA INCLUDING ELAVATED CONNECTION WITH PROPOSED MOGRA-KAMPA-BARAJAGULI ROAD CORRIDOR IN THE DISTRICT OF NORTH 24 PARGANAS IN WEST BENGAL PHASE II ON EPC MODE
Consultancy Services for Authoritys Engineer for WIDENING and STRENGTHENING OF BONGAON CHAKDAHA ROAD (SH1),FROM 2LANE WITH PAVED SHOULDER TO STANDARD 4LANE CONFIGURATION FROM 0.000 KM TO 6.717 KM AND FROM 10.568 KM TO 31.328 KM..
Construction for Widening and Strengthening of Bongaon Chakdaha Road SH1 from 2 lane with paved shoulder to standard 4 lane configuration from 0.000 km to 6.717 km and from 10.568 km to 31.328 km including 2 truck terminals in Phase I
CONSTRUCTION OF WIDENING TO 4 LANE CONFIGURATION OF CHAMPADANGA PURSURA ARAMBAGH ROAD SECTION OF SH2 IN THE DISTRICT OF HOOGHLY PHASE-I PROPOSAL FROM 0.00 KM to 11.90 KM AND 15.20 KM to 19.626 KM
Consultancy Services for Authoritys Engineer for Construction of Widening to 4 Lane Configuration of Champadanga Pursura Arambagh Road Section of SH-2, in the District of Hooghly
CONSULTANCY SERVICES FOR SUPERVISION OF CIVIL WORKS OF CONSTRUCTION OF TRUCK LAYBYS AT STRETCHES OVER CHANDITALA SEAKHALA CHAMPADANGA ROAD SECTION OF SH15 IN THE DISTRICT HOOGHLY IN WEST BENGAL
CONSTRUCTION OF TRUCK LAYBYS AT STRETCHES OVER CHANDITALA SEAKHALA CHAMPADANGA ROAD SECTION OF SH-15 IN THE DISTRICT HOOGHLY IN WEST BENGAL
Consultancy Services for preparation of DPR for Strengthening and Widening to Standard 4Lane of Existing 2 Lane Road from Bongaon to Chakdaha(From km 0.00 to km 32.0) including construction of Truck Terminals in the District of N 24 Parganas in WB
Collection of User Fee on BK Expressway in the Dist. of North 24 Pgs and Nadia at existing User Fee Collection Plaza at -i) Gates No-1 near Sodepur More ii) Gate No-2 near Wireless More and iii) Gate No-3 near Kampa More.