Loading…
Loading…
1,244 results • Latest
SMC Junction or Distribution Box for 3Ph Connection for AB Cable
Construction of new 33 kV UG line by microtunneling and laying of 200 mm dia PE80 PN6 HDPE pipe and laying of 33 kV 3C 400 sq mm XLPE cable at different places from Singhti 3311 kV Sub-Station to Sheagori 3311 kV SS of Howrah II Division.
Installation of new Pelton Runner after dismantling of the existing damaged runner and its subsequent store return at RHP Stage II
OVERHAULING OF 65/10 T CAPACITY, CLASS-I, INDOOR TYPE, GREAVES COTTON AND CO. LIMITED MAKE EOT CRANE AT RAMMAM HYDEL PROJECT, STAGE-II, WBSEDCL
Supply and Delivery of MOOG make Direct Drive Valve and YUKEN make Directional Control Valve at Rammam Hydel Project, Stage II, WBSEDCL
Installation and commissioning of Pelton Runner along with dismantling of existing damaged runner and returning it to store for 01 no 12.75 MW T-G set installed within the Power House of Rammam Hydel Project, St II
DESIGN, ENGINEERING, MANUFACTURING, SUPPLY AND SUPERVISION OF INSTALLATION, TESTING AND COMMISSIONING OF ONE (01) NO. VERTICAL TURBINE PUMP-MOTOR SET AT RAMMAM HYDEL PROJECT, STAGE-II, WBSEDCL, DIST.-DARJEELING, PIN-734201
Dismantling and assembling of Turbine parts along with runner guide vane and alignment testing and commissioning of Unit 1 along with all allied works for Leakage Arrest and Rectification work of Stay ring Unit 1 at Stage I Power House JHP
Thorough renovation of the existing CRB, development of Switchyard, construction of pathways, repairing of the boundary wall and other ancillary civil works within the premises of Bharatpur 33/11 KV Sub Station under Kandi Division, Dist- Murshidabad
Extension of control room building, construction of equipment foundation, cable trench and pathways and allied civil work at Bhuinara 33/11 kV sub-station under Ghatal Division under Paschim Medinipur region