Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
189 live105 closing this weekmost from WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD and West Bengal State Electricity Distribution Company Limited
189 results • Latest
Supply, delivery and installation of 11 KV Straight Through Jointing Kits and End Termination Kits for various XLPE and AB cable sizes under Barasat Division.
Supply, delivery and installation of 33 KV Straight Through Jointing Kits and End Termination Kits for 3Cx400 sq.mm. XLPE cable under Barasat Division.
Laying of 11 KV 3C x 300 Sq.mm XLPE UG Cable at different locations by micro-tunneling and cut and cover method to ensure uninterrupted, quality power supply and preventive maintenance and as per requirement from District authority for the forthcoming Gangasagar Mela—2027 in the jurisdiction of Kakdwip Division, under South 24 Parganas Region,WBSEDCL.
Work related to River Transportation of Iron materials 93.57 MT & DTR 100 KVA 25 NOS from Divisional Store of Kakdwip Division to Rudranagar CCC via Lot-8 Vessel Ghat to Kachuberia Ghat by crossing Muriganga River and delivery of the same to Rudranagar CCC, i.c.w Ganga Sagar Mela-2027 under Kakdwip Division, WBSEDCL. (Complete job description can be found in BOQ of this Tender)
Work related to River Transportation of 8 & 9 meter PCC Poles from Divisional Store of Kakdwip Division to Rudranagar CCC via Lot-8 Vessel Ghat to Kachuberia Ghat by crossing Muriganga River and delivery of the same to Rudranagar CCC, i.c.w Ganga Sagar Mela 2027 under Kakdwip Division, WBSEDCL. (Complete job description can be found in BOQ of this Tender)
Supply & Delivery of Galvanised (Hot Dip Zinc Coating as per IS 4736-1986) V Bracket for 33 KV line to Divisional Store, Divisional Office, Alipurduar under Regional Office, Alipurduar.
Supply and Delivery of Galvanized (Hot Dip Zinc Coating As Per Is 4736 1986) V Bracket for 33 KV line to the Divisional Store, Division Office, Alipurduar under Regional Office, Alipurduar.
River transportation of Iron materials 93.57 MT DTR 100 KVA 25 NOS from Divisional Store of Kakdwip Division to Rudranagar CCC via Lot 8 Vessel Ghat to Kachuberia Ghat by crossing Muriganga River and elivery of the same to Rudranagar CCC.
Work related to River Transportation of 8, 9 meter PCC Poles from Divisional Store of Kakdwip Division to Rudranagar CCC via Lot-8 Vessel Ghat to Kachuberia Ghat by crossing Muriganga River and delivery of the same to Rudranagar CCC,
Procurement of silicon coated fiberglass insulated cover for 6MM wire for sfety related works under Egra Division, WBSEDCL.
Annual Civil Maintenance works of the Office Buildings, Control Room Buildings, CCC Buildings and other allied works as and when required by the Department under Uluberia Division for a period of one year from the date of issuance of the Formal Order
Engagement of transport contractors (Truck/Trailor owners) for road transportation of 8M & 9M long PCC Poles on rate contract basis of WBSEDCL.
Engagement of transport contractors (Truck/Trailor owners) for road transportation of electrical equipments/materials on rate contract basis of WBSEDCL.
Biennial Rate Contract for road Transportation of electrical equipment ,materials, including loading, unloading and proper stacking
Biennial Rate Contract, Road Transportation of 8m and 9m long PCC poles, including loading, unloading and proper stacking
Supply,transportation,installation and commissioning of Raychem or 3M make HS joint kits for drawl of 11 KV fdr from Devaloke SS for Sugam Prakriti Housing and Teghoriya Booster Pump and drawl of 11 KV fdr from Megacity SS to Botanica Housing under Garia Division, WBSEDCL
SINGLE TENSION HARDWARE FITTINGS WITH COMPRESSION TYPE DEAD END CLAMP FOR ACSR WOLF CONDUCTOR (150 sqmm.)
e-Tender cum e-Reverse Auction from bidders for procurement of power on short term basis for the period from 25.03.2027 to 06.10.2027
Erection works i.e. 1) 33 KV DOG to PANTHER conversion, 2) Supply & fixing of compressed type connection, at Karimpur 33/11 Kv Sub-Station under Tehatta (D) Division
SINGLE TENSION HARDWARE FITTINGS WITH COMPRESSION TYPE DEAD END CLAMP FOR ACSR WOLF CONDUCTOR 150 sqmm Make RAYCHEM/ENSTO/TYCO/SICAM/SKIC/INDO/SINTEX (WBSEDCL Material code 0504010332 TEST CERTIFICATE COMPULSORY Drawing Specification Enclosed
Erection works ie 1 33 KV DOG to PANTHER conversion 2 Supply fixing of compressed type connection at Karimpur 33 11 Kv Sub Station under Tehatta D Division
Supply,transportation,installation and commissioning of Raychem or 3M make HS joint kits for drawl of 11 KV fdr from Devaloke SS for Sugam Prakriti Housing and Teghoriya Booster Pump and drawl of 11 KV fdr from Megacity SS to Botanica Housing unde
Installation of 33 KV and 11 KV electrical equipment with associated other electrical works for construction of new 33/11 KV Temporary Substation at Katiahat under Baduria Division, District North 24 Parganas.
Supply & Delivery of LTDISTBOX 3PH CON.WH.ST.STRAP&BUCKLE-ABC)(504060941)
Plain Copier Paper (V3) ISIMarkedto IS14490 (Q4)
Supply and Delivery of 400 Nos LTDISTBOX 3PH CON.WH ST.STRAP BUCKLE-ABC under Gazole Division of WBSEDCL
Supply and delivery of Silicon coated Fibreglass insulated cover for GI eartf wire 6MM under Egra Division
Engagement of Service Provider for disposal of scrap materials lying at different stores/establishments/units of WBSEDCL through e-auction for a period of 2 years w.e.f. 01.04.2027 to 31.03.2029 with a provision for further extension of 1 year after satisfactory completion of 2 years' service subject to approval of competent authority.
Annual Civil Maintenance works of the Office Buildings, Control Room Buildings, CCC Buildings and other allied works as and when required by the Department under Howrah Division-II for a period of one year from the date of issuance of the Formal Order.
Annual Civil Maintenance works of the Office Buildings, Control Room Buildings,CCC Buildings and other allied works as and when required by the Department under Howrah Division II for a period of one year from the date of issuance of the Formal Order
Engagement of service provider for disposal of various scrap materials lying at different stores_ establishments of WBSEDCL through e_auction
Renovation and maintenance of the existing access road of Baduria 33/11 kV Sub Station under Baduria Division in 24 Pgs (North) Region NIT No. : RM/24PNR/Civil/26-27/05 dated 18.11.2026
AMC OF 8 Nos OF AC
Carrying out replacement/repairing work of damaged Slip-Ring assembly of Unit#1 at Rinchington Hydel Power Station under Mini-Micro Hydel Division, WBSEDCL, Kurseong
Carrying out replacement/repairing work of damaged Slip Ring assembly of Unit 1 at Rinchington Hydel Power Station under Mini Micro Hydel Division, WBSEDCL, Kurseong
Online UPS (?10KVA) Without Battery Conforming To IS16242 (Part1) (Q2)
construction of one 33KV Bay with AI pipe bus at the premises of M/S Indorama India Pvt Ltd under Haldia(D) Division.
Renovation and maintenance of the existing access road of Baduria 33/11 kV Sub Station under Baduria Division in 24 Pgs (North) Region
Evacuation of 05 nos 11 kV feeders from 4Sight Florence 33 kV SS by Laying and dressing of 11KV 3C 300sqmm XLPE Cable of RL 3.850KM including Micro tunneling work with laying of 160 mm dia HDPE pipe PE80, PN6 3.75KM under Garia Division
Evacuation of 05 nos 11 kV feeders from 4Sight Florence 33 kV SS by Laying and dressing of 11KV 3C 300sqmm XLPE Cable of RL 3.850KM including Micro tunneling work with laying of 160 mm dia HDPE pipe PE80, PN6 3.75KM under Garia Division
Supply, delivery, installation & commissioning of 01 No. battery bank (with Buy-back purchase) for Stage-II Power House, JHP, WBSEDCL, PO & PS –Jaldhaka, Dist. Kalimpong, West Bengal 734503.
Supply delivery installation and commissioning of 01 No battery bank with Buy back purchase for Stage II Power House PO and PS Jaldhaka Dist Kalimpong West Bengal 734503
11 kV 185sqmm UG Cable laying by microtunneling work with supply of HDPE Pipe and GI Pipe at Sujapur 33/11 kv s/stn for 11 kv O/G feeder from O/G ISL DP to 11 kv line under Malda Division of WBSEDCL
Installation of Roof top Shade at the top of the Roof and installation of Air Ventilation Fan at least 4 Nos. for East and West side of the 1st floor of Division Office Building at Islampur Division under Uttar Dinajpur Region (2nd call).
Construction of 1 no CT and 1 no PT Plinth, construction of 600mm x 600mm and 300mm x 300mm cable trench, gravel spreading and electrical erection works for one incoming feeder bay works at Bangar 33/11 KV Substation under Raiganj Division(2nd call).
Drawal of UG cable line for bifurcation of Bagunda 11 KV feeder , as per labour schedule provided herewith , emanating from Debagram GSS under Nakashipara Division
Bifurcation of Bagunda 11 KV feeder
construction of one 33KV Bay with AI pipe bus at the premises of MS Indorama India Pvt Ltd under Haldia Division
Sinking of one number deep tubewell (100mm x 50mm) with installation of 1HP submersible pump with motor set & allied works at Bagnan-I CCC under Uluberia Division in the District of Howrah.
Sinking of one number deep tubewell 100mm x 50mm with installation of 1HP submersible pump with motor set and allied works at Bagnan I CCC under Uluberia Division in the District of Howrah