Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
1,159 live437 closing this weekmost from West Central Railway and Indian Railways
1,159 results • Latest
ELECTRODES CLASS N1 SIZE 4 X 450MM TO IRSM 28/12 . The date of supply of the material should be within 60 days from the date of manufacture.
Stainless steel Electrode Size 3.15mm dia & length 350 mm class M-4 heavy coated, code E 23.12 LR 26 as per IS: 5206/83 IRS M-28/12 amendment /and-2 Special condition- Material is manufactured with 60 days of supply.
SOLID WITH SHIELD GAS COPPER COATED MIG/CO2 WELDING WIRE DIA 1.2 MM IN 12.5 KG PACKING IN ONE SPOOL CONFIRMS TO TABLE NO.1,SR.NO. 1 OF IRS SPECIFICATION IRSM 46-13 WITH AMEND NO.1 OF 2005
Liplex 'T-2' Grease 'T-2' in 18 Kg Sealed pack of Balmer Lawrie make or servogem 2 of M/s IOCL make.
Galvanised Steel Wire Rope DIA 3MM Having Construction 6X19(12/6/1) WSC-1770 As Per IS: 3459/1977 TAB-2, Galvanised As per IS:1835/1976 Type-B .
Rate Contract for Manufacture and supply of fittings for Thick Web Switches for 1 in 12, turn out BG (1673 mm) for 60 Kg on PSC sleepers to RDSO Drg. No. T-6155 (Alt. 13)
CROWN WHEEL & PINION PART NO.UD64.1355Z/UD64.54Z (PINION TEETH-9 &CROWN TEETH-32),
Improved Design Silica Breather Assly for Loco Transformer
Set of MACHINED items for TM type HS-15250A, (08 items 13 Nos)
Compact Flash Memory Card 128 MB
Set of Step Size racer for Axle Box bearing
Channel Pin single side grooved 7mm dia (for 4mm dia bond wire) as per Spec. IRS:S-17/75 with latest amendment as per Drg. No. S/69/M/IRS with latest alteration. Spec:
Regulating Equipment (ATD)
Rate contract for Manufacture and supply of 1 IN 8.5 TWS RDSO Drg. No. T- 9775
Construction of 4th BG Line from Itarsi (Km 745.130) to Bina (Km 982.130) including Earthwork, Tunnels, Bridges, Road over Bridge (ROB), Road under Bridge (RUB), station buildings, track works, Electrification, Signaling & Telecommunication works, and allied miscellaneous works in connection with Itarsi - Bina 4th Line Project under West Central Railway in the State of Madhya Pradesh.
Kota Divn : Enhancing the system redundancy by provision of Digital Axle Counters in parallel with Track circuits at stations yard on Main Line in Kota - Mathura section.
Provision of Wheel wise load measurement & WAG 12 upgradation in EIMWBs at Panihar EIMWB site (Wheelbase measurement system upgradation (including weight indicator, control panel, electronic cards, and related accessories & WAG-12 elimination material)
Project General Management Service (PGMS-1) for Projects in Construction Organization under CAO/Const of West Central Railway.
Blocking & reduction in height of doors of 7500 BOXN wagons at ROH Depot NKJ
3 Phase Asynchronous Traction Motor Type 6FRA-6068 for WAG-9H loco without active speed sensor as per CLW Specification no. 4TMS.096.080, Rev.-1, Alt.-5, with Scheme-I Design Rotor as per Railway Board Letter No. 2005/ Elect (TRS)/440/18/5(3ph) dated 02.03.2026 Material will be supplied to each consignee as follows: SSE/STORES/ELS/TRS/NKJ=15 Nos., SSE/STORES/ELS/TKD=21 Nos., SSE/ELS/ET=20 Nos.