BRAKE HEAD [FABRICATED] TO ICF DRG. NO. [BRAKE HEAD [FABRICATED] TO ICF DRG. NO. EMU/M-3 1-008, ALT- h/2. MATERIAL AND SPECIFICATION AS PER DRAWING]
Nylon bush for alternator suspension bra [Nylon bush for alternator suspension bracket for Non-AC (13T Bogie), size- phy42 x phy32.5 x 50 mm to RDSO Drg. No. RDSO/PE/SK/TL-0129-2009 (Rev-0), Alt.-1 & RDSO Spec. No. RDSO/PE/SPEC/AC/0006- 2009]
ADEN(M) Bhopal section: Improvement of Bridges Health condition of Bridge No. 763/3 UP & DN, 775/2 UP, 775/6 MID, 777/4 UP, 779/1 UP, 781/1 UP, 784/3 UP, 786/1 UP, 787/1 MID, 789/1 UP, 790/1 UP, 791/1 UP & DN, 792/1 UP, 792/1 DN, 792/3 UP, 793/1 UP, 793/2 UP, 793/2 DN, 793/4 UP, 793/4 DN, 794/1 UP & DN, 796/1 UP, 797/1 UP, 802/1 UP, 803/1 UP, 805/1 UP, 841/1 DN, 844/1 DN, 846/1 MID & 846/1 DN (30 Bridges) by pointing, epoxy grouting, pitching, flooring, repairs to catch water drain & inspection steps, rebuilding of wing wall & return wall under ADEN/M/Bhopal section.
Cast nylon 66 bush outer dia 45 mm inner [Cast nylon 66 bush outer dia 45 mm inner dia 35 mm, length 50 mm tolerances as per drawing no. RDSO/PE/SK/AC-0128- 2009(REV 0) with alteration no. 1 confirming to RDSO Spec. No. RDSO/PE/AC/0006- 2009 (REV.1). ]
ADEN Vidisha section: Heavy repairs to Ballast retaining wall, Dirt wall, toe-wall wing wall, catch-water drain, Inspection steps and other minor works at Bridge No. 856/3, 859/1, 862/1, 863/1,864/1, 866/1, 868/1, 869/1, 870/1, 871/1, 873/2, 875/1, 875/2, 885/1, 886/1, 887/1, 889/1, 889/2, 893/1, 900/1, 901/1, 902/1, 905/1, 907/1, 910/1, 913/1, 915/1, 918/1, 919/1, 920/1, 921/1, 926/1, 933/1, 934/1 and repairs to cess at Br. no. 886/1 (Mid and UP line) and 928/1 under ADEN/Vidisha section.
Rate Contract for COMPOSITE GROOVED RUBBER SOLE PLATE(CGRSP) FOR 60 KG. UIC RAIL WITH 6.2 MM THICKNESS DRG: (RDSO) RDSO/T-6618
Rate contract for ELASTIC RAIL CLIP(ERC) J CLIP WITH HIGHER TOE LOAD TO DRG:(RDSO) RDSO_T_8258
Face plate for buffer plunger to RDSO SK-94254, Alt.3,
Guna-Gwalior Section: Through rail renewal TRR (P) at Part A) Km 1196.4-1226.4, Part B) Km 1229.0-1256.6 & Km 1277.8-1281.5 and Part C) km 1298.0-1311.950, Total 75.25 Km under ADEN/Shivpuri section.