Loading…
Loading…
371 results • Recent activity
M/R to Irrigation Bundh Gurudham Harinarayanpur for a length of 100.00 Mtr. at MugKailyan G.P,under Bagnan-II Block, P.S-Bagnan, District-Howrah.
Protection work at left side of Bhawanipur Sluice structure and at confluence point of Bhawanipur Khal and Old Damodar for the length of 65.00 metre at G.P-Balichaturi, Block-Shyampur-I,P.S-Shyampur, Dist-Howrah.
Protection work along left bank of Chandanapara Khal for a length of 48.00 M at Daluipara in gG.P-Hallyan, Block-Bagnan-II, P.S-Bagnan, Dist-Howrah under Seijberia(I) Sub-Division.
Restoration of slipes, erosions along the countryside of river Rupnarayan left bank over right side of existing drainage channel parallel to the Rupnarayan left at Shibpur near Shibpur wooden bridge for a length of 30.00m in G.P-Baneswarpur-II,
Re-Construction of wooden Bridge(Length-18.70 metre) over Nabibbabu Khal in G.P-Chandipur, P.S-Amta, Block-Amta-I, District-Howrah under LDC Sub-Division No-II
Re-Construction of wooden bridge Somruk in place of damage wooden bridge over Kashmul Khal G.P-Hutgacha-II, P.S-Uluberia, Block-Uluberia-I, District-Howrah.