Loading…
Loading…
58 results • Latest
Soil Investigation and Topographic hydrographic Survey work for re-excavation of the Ghatua khal from khar to Purusottompur (length- 8.00 km) within G.P- Khar Pachet in Block- Egra-II Patashpur -I,Dist-Purba Medinipur
Soil Investigation for proposed construction of RCC Bridge over HTC near Tentulbari Triratna Club, Mouza-Manoharpur, GP- Boyal-I, Block- Nandigram-II, Dist.- Purba Medinipur
Soil Investigation and Survey work for Construction of Gagra Sluice near Gagra outfall of Talpati Khal into river Haldi at Mouza-Gagra,G.P-Sonachura in Block -Nandigram-I, Dist-Purba Medinipur
Soil investigation work for Proposed R.C.C Bridge at Gopalpur near Monoharpur JP Primary School over H.T.C. khal at G.P. Khodambari-II in Block-Nandigram-II and Dist.- Purba Medinipur
Soil Investigation and Survey work for Construction of R.C.C Bridge over Talpati Khal near Golabari Baharganj at Mouza- Ranichak, G.P-Amedabad-II in Block -Nandigram-II Khejuri -I, Dist-Purba Medinipur
Soil investigation work for Re-Construction of Mangalchalk 11 vent sluice over HTC Khal at G.P.- Boyal-I in Block-Nandigram-II and Dist.-Purba Medinipur.
Soil Investigation work for Proposed R.C.C Bridge at Mangalchak over H.T.C. khal at G.P.- Boyal-I in Block- Nandigram-II and Dist.- Purba Medinipur
IPM Work of Midnapore Main Canal MMC from Ch 28.1 km to Ch 31.9 km Canal No 8 from Ch 5 km to Ch 10 km Canal No 11 from Ch 0 km to Ch 1.5 km and Canal No 12 from Ch 5 km to Ch 10 km of MMC System Total working Length 15.3 Km
IPM works of Dy 1S In between Ch 0 km and Ch 4.5 Km Dy 2A In between Ch 0 Km and Ch 3 Km Nag Canal In between Ch 0 km and Ch 2.5 Km Total Length 10 Km for Khariff Irrigation 2026 in Block Kharagpur-II PS Kharagpur L Dist Paschim Medinipur
IPM works of Dy 1A In between Ch 0 Km and Ch2.8 km Dy 1B In between ch 0 Km and ch 4.2 Km Dy 1C In between Ch 0 Km and ch 2 Km Total length 9 Km for Khariff Irrigation 2026 in Block Kharagpur II PS Kharagpur L Dist Paschim Medinipur