Loading…
Loading…
589 results • Recent activity
Urgent flood protection and mitigation work by emergent repair of slope faliure 35M on Ex Zamindary Embkt at RBank of Tamal occurred due to rainfall and subsequent discharge from 30.06.25 to 04.07.25 at Mouza Sarai in G.P10 No Keshpur,Block-Keshpur
Urgent flood protection and mitigation work by emergent repair of slope faliure55 M on Ex Zamindary Embkt at R Bank of Tamal occurred due to rainfall and subsequent discharge from 30.06.25 to 04.07.25 at Mouza Sarai, in G.P10 No Keshpur,Block-Keshpur
Urgent flood protection and mitigation work by emergent repair of slope faliure 65 M on Ex Zamindary Embkt at R Bank of Tamal occurred due to rainfall, subsequent discharge from 30.06.25 to 04.07.25 at Mouza Singpur in G.P9 NoAnandapur,Block-Keshpur
Urgent flood protection and mitigation work by repairing damaged IP of R Embkt of Bhosra Khal from Purba Dwar Khola to Chakrapan Nanda Bag House length of 3000M occurred due to rainfall, Mouza.Purbadar Khola, Briandapur, Chak Purusuttam,Chak Madhuri,
Urgent flood mitigation work to reduce vulnerability of people by Clearing and Removing of water hyacinth at US of 10 vent Sluice over Bhosra Khal at Purbadar Khola, Briandapur, Chakpurusuttam, ChakMadhuri, Chak Kripan Tangaishree in Block- Debra
Urgent flood protection and mitigation work by mending slip in between ch.23.01 km to ch.23.25 km on R Embkt of Cossye TE1H1 for length of 100 M at Mouza Ramchandrapur in Block Debra,P.S Debra, Dist Paschim Medinipur.