Loading…
Loading…
592 results • Recent activity
Survey works for framing proposal for Construction of R.C.C bridge and culvert over 4 main canal, village canal and Pastubi Khal at different 5 five nos location in Mouza Gokulchak, Jalchak, Maligram and Ragpur, Block and PSPingla, DistPaschim Me
Procurement of Earth at Goura Office Compound as a Flood Fighting Material for reducing vulnerability overcoming monsoon-2026 at Mouza Uttar Gobindanagar in Block DaspurI, PS.Daspur and Dist. Paschim Medinipur.
Procurement of Earth at Ranichak Pump House Campus as a Flood Fighting Material for reducing vulnerability overcoming monsoon-2026 at Mouza Ranichak in BlockDaspurII, PS.Daspur and Dist Paschim Medinipur.
Restoration of damaged Left and Right bank of Gomrai Khal near Nischintapur RCC Bridge for a length of 60.00 meter at Mouza Nischintapur in Block Daspur II, PS.Daspur and Dist. Paschim Medinipur
Restoration of Slip 30.00 M along with repairing of damaged D.C Embankment of Old Cossye River near kadilpur sluice occurred due to heavy rainfall at at Mouza Kadilpur in Block Daspur I, PS Daspur and Dist. Paschim Medinipur.
Restoration of Slip 55.00 M along with repairing of damaged Embankment on Left Ex Zamindary Embankment of Shilabati River from house of Laxman Adak to Bharat Adak at Mouza ShilaRajnagar in G.P Ajobnagar II, Block Ghatal, P.S Ghatal and Dist.Pasc