Loading…
Loading…
468 results • Latest
Operation and Maintenance of distribution system including rising main, FHTC, OHR deployment of man power, checking of status of supply in the command area, reparing of leakages, busting pipe line including round the clock watch ward to ensure
Operation and Maintenance of distribution system including rising main, FHTC, OHR deployment of man power, checking of status of supply in the command area, reparing of leakages, busting pipe line including round the clock watch ward to ensure
Operation and Maintenance of distribution system including rising main, FHTC, OHR deployment of man power, checking of status of supply in the command area, reparing of leakages, busting pipe line including round the clock watch ward to ensure
Repair and renovation of Boundary Wall for OHR site under Kamarda Water Supply scheme
Laying of damage distribution pipe line by UPVC pipes with allied works of Kanakpur and its adjoining mouzas WS Scheme in Patashpur-I Block
Repairing of R.C.C. Elevated Reservoir of capacity 100 cum and staging height 20.00 mtr. with allied works for Damudarpur Water Supply Scheme within Contai-I Block
Laying Distribution System Nodal Point- 189 to 190 of HDPE Pipe line along parallal of Contai Belda Pwd (road) within HAIPUR water supply scheme in Contai-I Block
150 mm dia GI pipes TATA make carrier pipe of of Railway Track Between Station Nachinda and Kanthi of Augmentation of Durmuth PWSS under Contai Sub-Division of Tamluk Division PHE Dte.
Laying of HDPE pipes with allied works at Left Out Portion of PART-L for Augmentation of Mukutshila Zone II PWSS within Khejuri-I Block under Contai Sub-Division of Tamluk Division PHE Dte.
Monidaha Piped Water Supply Scheme