Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
1,709 live699 closing this weekmost from Western Railway and Indian Railways
1,709 results • Latest
EL/WA/PL/2026-27/26 Modification works in 4.5 KW under slung REBC of shifting of MCBs in SBC panel of LHB AC Coaches and provision of indications on-board for LHB AC & Non-ACcoaches.
PARALLEL GUIDE BAR FOR HIGH REACH PANTOGRAPH TYPE WBL85 .
Lower spring beam complete for standardised equalizing stay.
Mumbai Suburban Section (Churchgate - Virar) - Upkeep of electrical assets in railway colonies for 02 years.
RAJKOT Division: Re-girdering by Composite Girder & Sub-structure strengthening work of Bridge No. 143 DN (13X16.15+1X15.25+1X12.20 M) at KM-702/0-2 and Bridge No. 427 (1X12.20 + 6X18.30 M) at KM-883/3-5 between Viramgam-Okha section (By new composite girders with 25 tonne standard loading) under the jurisdiction of Senior Section Engineer (Bridge) Rajkot.
Outer door assembly complete with Left hand opening as per ICF Drg no. ICF/STD-5-1-002,alt t/nil.(Sheet-1&2),Col.no. II. Note: - i) Dimension in detail item. Door pillar as per ICF Drg. No.T-5-1-511 Alt-q / 3. in outer Door assembly, Thickness of Plate shall be Increased to 5 mm in Place of 2 mm. ii) Upper and Lower Bearing Journal as per ICF Drg. No T-5-1-512 alt-q / 3. & T-5-1-642, alt-r / 2. Dimension 2.5 mm from C/L shall be increased to 4 mm.
48 FIBRE ARMOURED OPTICAL FIBRE CABLE (OFC)
Design, Supply, Installation, Testing and Commissioning of Electronic Interlocking (E.I) system along with other Indoor and outdoor Signalling works at Churchgate & Bandra Terminus of Mumbai Division, Western Railway.
SUPPLY, INSTALLATION, TESTING AND COMMISIONING OF FLUID TYPE WHEEL FLANGE LUBRICATION (WFL).
Repair kit for Magnet frame of Hitachi traction motor.
Item as per attached detailed technical specifications
Ukai Songadh-Jalgaon section: Providing new 3.66M FOB with dog legged ramp at NSG6 Lakkadkot, Bhadbhunja and old Kolde under SSE/W/Navapur and Provision of new FOB between PF no 2/3 to line no 9 in lieu of old dialapidated FOB at Nandurbar and new FOB in Nawapur under the jurisdiction of ADEN/Nandurbar of Western Railway.
Ukai Songhad - Jalgaon section: - Supply of potable drinking water at Chaupale,Ranala,Dondaicha,Sindkheda & Vikhran Road Station , Platform & Staff Quarters for a period of two years under the SSE/W/NDB jurisdiction.
Ukaisonghad-Jalgaon section: - Extension of Platform no.1 at Amalner & platform No.2 at Dharangaon with shelter hut covershed on Platform under the jurisdiction of ADEN/Amalner of Western Railway.
Design, Supply, Erection, Testing & Commissioning of 25 KV AC OHE Dabhoi to Samalya, PTD to Bhadran & EI work at Sevaliya on Vadodara Division of Western Railway in connection with GC Work & EI Work
Reconditioning/ Overhauling of Tamping units of Plasser make Plain Track Tampers machines such as CSM/WST/DUOMATIC and CSM-3X/ HOT - 3X/DTE during POH at CPOH ADI & working in CR, WCR, NWR & WR zone for the year 2026-27.
NU322 ECMRA/C4HVA3091R2 CYLINDRICAL ROLLER BEARING FOR DE OF MEDHA