Loading…
Loading…
9 results • Recent activity
Construction of Additional Structures SLR Bridge at Km. 5.995, CD.Hume pipe works at Km 4.240 ,4.760 and Construction of SLR Bridge at Km 5.200, Foot Bridge at Km 5.800 and Residual E/W , PCC lining for total length of 476m at different chainage fr
Construction of Boundray Wall and Fencing work of Km. 12.22 to Km 14.10 of KRMC (Tunnel Part) and PCC Road (245m) and Paver Block inside proposed boundary wall in city area Sundernagar, Jamshedpur for Protection of Land encroachment.
Construction of RCC Box (2.20mx2.0m) for Canal Pipeline (1600mm Dia) between Mast No.239/15-17 between Govindpur Station and Asanbani Station for Asanbani Sub-Distributary canal in Mumbai -Howrah route of S.E.R in CKP Division.