Loading…
Loading…
17 results • Recent activity
Construction of 824 ft (256ft three tier plus 120ft four tier plus 448ft two tier) stone steining for the protection of road, abadi, village playground and causeway from Tibbi Wali Nadi in Village Tibbi after Flood 2025.
Constructing 576 ft. four tier steining for the protection of abadi of village Natwal from river Tangri after flood 2025
Construction of causeway on Berghati river X-ing Pinjore to Magniwala road at village Deewanwala.
Constructing 352 ft three tier steining for the protection of Abadi of Chandimandir from River Kaushalya after flood 2025
Constructing 624 ft three tier steining for the protection of Gurudwara Sahib, Shamshan Ghat, Chhat Puja Ghat and Abadi of village Shahpur from River Balad after flood 2025
Constructing 752 ft three tier steining for the protection of Abadi area of Mahadev Colony from river jhajjra after flood 2025