Loading…
Loading…
139 results • Recent activity
Repair and Maintenance of distribution gridline for the period of six months i.e. 180 days Andul Mohiary Zone-I FAWS Scheme (Grid Length33.60 KM)
Operation and Maintenance of 15 MGD Surface water treatment plant (both for Civil and E and M component......District- 24 Parganas (North), for a period of 36 months.
Supply and Installation replacement of damaged 700 mm dia Butterfly Valve situated on the interconnection.....Water Pumping Station along with other ancillary works.
Operation and Maintenance of water treatment plant of capacity 104 MLD with 10 percent overloading (both for Civil and E and M component of works) including.....North 24 Parganas for a period of 36 (thirty six) months.
Operation of different dia sluice valve at different points for distribution........Dum Dum Municipality area for a period of 1(one) year.
Repairing of 8 nos. Leakages on 150 mm dia pipe line at Ward No. - 1 ......Ward No. 13 (5 nos.) under Diamond Harbour Municipality