Loading…
Loading…
5 results • Latest
Painting of non-galvanized Steel Structures &ampamp Equipments at 220KV GSS RVPN, Dooni
Emergency repairing work of 220 KV Dooni -Kota(PGCIL) Line Between Loc No. 19 to 20 under Break down condition (Conductor are Falling down from tower between location No. 19 to 20) (Section-Loc.No. 18-27) on dated 07.07.2026
Emergency repairing work of 220 KV Dooni -Kota(PGCIL) Line Between Loc No. 19 to 20 under Break down condition (Conductor are Falling down from tower between location No. 19 to 20) (Section-Loc.No. 18-27) on dated 07.07.2026
General &amp Yard Cleaning Works for all GSSs under 220 KV GSS, Dooni Division. (w.e.f. 20.06.2026 to 31.08.2026 i.e 73 Days )
General and yard cleaning works for all GSSs under 220 KV GSS Dooni division w.e.f. 01.06.2026 to 31.08.2026 (92 days)