Loading…
Loading…
359 results • Recent activity
Shifting of Existing 11KV Over head Network over the Plot Inside the Sector- 29 YEA (WC-EM-02)
Water Connection Leakage Repair Work in Rehabilitation and Resettlement Area of Village Abadi in Jewar Banger YEIDA. WC-04
Construction of R.C.C drain and interlocking tiles work thora garah road to canal in village thora garh .YEA. WC-06
Construction of 33 kv Underground Line from 220kv Sub-station Sector-18 to 33/11kv Substation ,Pocket -2c (SS no-4) and Pocket 2B (SS no-3) Sector-18 YEA (WC-EM-03)
Plantation of trees and shurbs in 50mtr wide green belt and 30 mtr wide road central verge and 24mtr road both side patri Sector - 22E with two year maintenance ,yeida WC-H
Construction of Boundary Wall of Rajkiya Government High School at Village- Wailana, YEA WC-06