Loading…
Loading…
Found 52 active tenders
52 results • Latest
Construction of New facilities proposed infrastructure, campus development of college campus for ram narayan memorial college at huntergunj, chatra-group B-Arts Block, Library and Auditorium.
Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50 M. including all lifts, levelling, ramming the foudation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/l.
Construction of bus terminal in simariya block in chatra district
25 KVAR CAPACITOR BANK Supply,Installation, testing & Commissioning of 3-Phase 415 V AC, 50Hz 25 KVAR APFC standard specification with delta connected capacitor bank.
Construction of Health Sub-Centre, At-GP-kaindinagar, vill-kade, Block-Kanhachatti
Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item B) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I.
Construction of Health Sub-Centre, At-GP-Nawada, vill-chiloi, Block-Kunda
Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item B) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I.
Construction of Health Sub-Centre, At-GP-Bodhdih, Block-Kunda
Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item B) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I.
Construction of Health Sub-Centre, At-GP-batchra north, Block-Tandwa
Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item B) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I.