Loading
Loading…
Loading…
14 results • Recent activity
Pre - School Education Kit for Anganwadi Centres (Q3) (3 (3 ))
Facility Management Services - LumpSum Based - 0; bicon library; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - 0; 0; Consumables to be provided by service provider (inclusive in contract cost)
Octagonal Pole (V2) (Q3), Electrical connection Lugs or thimbles (Q3) (3 (3 ))
PVC Flat Cable, Aluminium Conductor with PVC Insulation and Sheath as per IS 694 (Q3), LED Bulb with Battery as per IS 16102 (Q3), Switch Fuse Unit (Q3), LED Bulkhead Light (Q3), HT Tape (Q3) (3 (3 ))
LED Bulb with Battery as per IS 16102 (Q3) (3 (3 ))