Loading…
Loading…
497 results • Latest
Construction of Hanuman Gali road (Mandoli Industrial Area) and side drain at Mandoli in Gokalpur Constituency (AC-68).
Repair of boundary wall on the right bank of Ghazipur Drain from RD 5300 to RD 5450m, (Pedestrain bridge to DCP Office).
Construction of Mahavir Gali road (Mandoli Industrial Area) and side drain at Mandoli in Gokalpur Constituency (AC-68).
Strengthening of existing bitumen road by laying RMC on both sides of road from Rewela Khanpur to Kanganheri road in Matiala Assembly Constituency AC-34.
Providing temporary barricading using GI profile sheets fixed on wooden ballies at Escape Drain-I RD 0M to 980M.
Providing of Manpower services on outsourced basis in Civil Division No.-III office for year 2026-27 For the period of 03 Months (June 2026 to August 2026).
Manning, Operation and Maintenance of Amphibious Excavator for obstruction removal in Yamuna River or as directed under the jurisdiction of CD-III
Restoration of road from Bakkargarh village to Issapur village Najafgarh AC 35
Operation and preventive maintenance of Diesel/Electric Pump House and Trolly Mounted Diesel Pumps at Ekta Vihar Pump House for a period of 06 months from the date of commencement of work/Job
Construction of road and side drains (6,6A,6B,17,17A,17B,20,20A,22,22A,22B,22C)and Masjid Gali at Bengali Colony in Tughlakabad village in Tughlakabad Constituency,AC-52