Loading…
Loading…
586 results • Latest
Deployment of tractor mounted pump on hire basis at various location of Jahangirpuri drain for the flood season 2026-27.
Providing and fixing steel grill on left bank on existing boundary wall from RD 300 m to RD 1000 m at Supplementary drain.
Improvement of cremation ground road at village Neelwal in AC 08 Mundka.
Construction of Devi Mandir Road in Village Rithala Rithala Assembly Constituency 06.
Cleaning of Keshopur Pump House Pond and repair of wall and pump room at village Nilothi in Mundka.
Demolishing of existing single storey Chaupal and its reconstruction as double storey General Chaupal Rasoolpur Village in Mundka Assembly Constituency AC 08.
Fabrication and Supplying of M.S Wire Mesh Cover for footvalve of Pump at various sites under the Flood Circle-III.
Round the clock operation and watch and ward including Preventive maintenance of Permanent Electrical Pump House at Tilangpur Kotla site under the jurisdiction of FC-III.
Round the clock operation and watch and ward including Preventive maintenance of Permanent Electrical Pump House at Keshopur site under the jurisdiction of FC-III.
from water surface of the drain to maintain free flow of water by collecting maintenance clearing the bank road of the drain inner side and outer side slopes of Drain for 4 Months from RD 4140m to RD 0 m