Loading…
Loading…
1,118 results • Best match
Hiring of Boats - Dinghy with OB Engine & Fishing Trawler; Less than 7 years; Without Air-Conditioning; 7-10 Persons; Maximum 400 in case of DWRB retrieval and deployment; both OB and IB depending upon requirement; FRP fpr Dinghy and FRP & Wood for F..
Hiring of Boats - Dinghy with OB Engine & Fishing Trawler; Less than 7 years; Without Air-Conditioning; 7-10 Persons; Maximum 400 in case of DWRB retrieval and deployment; both OB and IB depending upon requirement; FRP fpr Dinghy and FRP & Wood for F..
Custom Bid for Services - Work Contract for maintenance of Air Handling Units etc of Valve Hall & DC Hall Ventilation Systems at HVDC, Agra S/s Similar Category Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System)
COMPREHENSIVE ANNUAL MAINTENANCE CONTRACT FOR 01 YEAR WITH THE DEPLOYMENT OF 01 (ONE) NO. SKILLED TECHNICIAN AT APL SITE FOR TOTAL 275 TR AIR COOLED DUCTED PACKAGE AIR CONDITIONING SYSTEM (HVAC), MAKE BLUE STAR SUPPLIED INSTALLED BY ADV VENTILATION
Annual Comprehensive Maintenance of Window/Split model (1.5 / 2.0 Ton Capacity) Room air condition Machine and 3 phase Concealed Split and Ductable Split Air Conditioner Machine installed at Natun Bhawan of BSMC H , Bankura BMC Electrical Section II
A) Routine checking and servicing (Preventive maintenance). i) Checking & servicing of all mechanical & electrical parts of the A.C.Machine, refrigerant system, condenser & cooling system etc. three times in each month. ii) Checking of performance of each machine, Load Current (Amp) , CFM, grill temperature¸ room temperature etc. on daily basis & these shall be noted, in Log Book. All entries be countersigned by the Agency and the concerned Junior Engineer in the Log Book. iii) In every month, the Outdoor unit should be thoroughly cleaned and washed by vacuum cleaner and jet spray. iv) All machine shall be numbered according to their location, made and as per direction of E.I.C & Log book be maintained accordingly. v) Cleaning of filters twice in each month. vi) Lubricating the bearing of the motor & fan as and when required vii) Checking the electrical incomer upto incoming M.C.B incl. starter, switches etc. in each month. Any fault located should be brought to the notice of the Asstt. Engineer & Junior Engineer immediately. viii) Checking & repairing of all parts which have not been specified but necessary to keep the machine satisfactory running condition. ix) Agency must be provide a trained attender for operation of ductable type AC machine. x) If any fire hazard occurred due to poor maintenance of the Split/Window/ductable split Air Conditioning machine, the liability will goes to solely on the concerned maintenance agency.
Operation And Maintenance Of Other Machines And Plants - Two-Year Maintenance Contract for Repair, Servicing, Maintenance of Air Conditioning Systems installed in HEMMs for working at Jagannath OCP on an every alternate day basis at Jagannath OCP
Operation And Maintenance Of Other Machines And Plants | Billing:monthly | Amount:654664
Annual Comprehensive Maintenance of of Window/ Split model (1.5/2.0 Ton Capacity) Room air condition Machine and 3 phase Concealed Split Ductable Split Air Conditioner Machine installed at Main Building of BSMC H, Bankura BMC Electrical Section II
A) Routine checking and servicing (Preventive maintenance). i) Checking & servicing of all mechanical & electrical parts of the A.C.Machine, refrigerant system, condenser & cooling system etc. three times in each month. ii) Checking of performance of each machine, Load Current (Amp) , CFM, grill temperature¸ room temperature etc. on daily basis & these shall be noted, in Log Book. All entries be countersigned by the Agency and the concerned Junior Engineer in the Log Book. iii) In every month, the Outdoor unit should be thoroughly cleaned and washed by vacuum cleaner and jet spray. iv) All machine shall be numbered according to their location, made and as per direction of E.I.C & Log book be maintained accordingly. v) Cleaning of filters twice in each month. vi) Lubricating the bearing of the motor & fan as and when required vii) Checking the electrical incomer upto incoming M.C.B incl. starter, switches etc. in each month. Any fault located should be brought to the notice of the Asstt. Engineer & Junior Engineer immediately. viii) Checking & repairing of all parts which have not been specified but necessary to keep the machine satisfactory running condition. ix) Agency must be provide a trained attender for operation of ductable type AC machine. x) If any fire hazard occurred due to poor maintenance of the Split/Window/ductable split Air Conditioning machine, the liability will goes to solely on the concerned maintenance agency.